During installation of the device, please install the slave machines first then the master
machines, in order to avoid a failure of installation due to a lack of space between the
master machine and the salve machines. Carefully mount the device onto the brackets
and make sure the bottom of the device is attached to the brackets.
One master machine can be matched with up to three more batteries. During the
installation of the project, it is necessary to consider whether space shall be reserved to
add new battery packs in the future. The expansion diagram is as follows.
Summary of Contents for TSOL-B100E-S
Page 1: ...31 TSOL B100E S...
Page 11: ...Fix the brackets in the marked position with hex screws...
Page 18: ......