Talent-MG2-WP/GP
www.tsun-ess.com
1
Warning
Contact
Dear customer, thank you for choosing the TSOL-M Series micro inverter from TSU-
NESS. We hope you will find our products meet your needs for renewable energy.
Meantime, we appreciate your feedbacks regarding our products.
This manual contains important instructions for Talent-MG2 Monitoring System. For
safety, only qualified technician, who has received training or has demonstrated skills can
install Talent-MG2 Monitoring System under the guide of this document.
If you have technical problems about our products, contact the TSUN Service line.
Read Me First
Only qualified personnel should install, troubleshoot, or replace the monitoring
system.
Before installation, check the unit to ensure absence of any transport or
handling damage, which could affect insulation integrity or safety clearances.
All repairs should be carried out using only qualified spare parts, which must be
installed in accordance with their intended use and by a licensed contractor or
authorized TSUNESS service representative.
el: +86-573-8466 8569
T
E-mail: [email protected] | www.tsun-ess.com
Add: Building E1, No. 555, Chuangye Road, Dayun Town, Jiashan County,
Jiaxing City, Zhejiang Province, China
TSUNESS Co., Ltd