background image

6

www.tsun-ess.com

4.Match the bracket’s upper buckle with monitor device. Then match the bracket’s lower 
buckle by gently press the lower side of the monitor device until hear the“Click”.

Note: Make sure the antennas are vertical to the wall.

5.Power on the monitor device.

Note: Monitor device could also be put on the table. Make sure the antennas are vertical 
to the table.

Talent-MG2-WP/GP

Summary of Contents for Talent-MG2-GP

Page 1: ...Talent MG2 WP Talent MG2 GP TSUNESS Co Ltd STORE THE FUTURE User Manual...

Page 2: ...microinverter and the monitoring device 9 Step 2 Establish an account 9 Step 3 Networking for the monitoring system 10 Step 5 Edit the system layout 14 DRM function 15 Zero export control function 16...

Page 3: ...f you have technical problems about our products contact the TSUN Service line Read Me First Only qualified personnel should install troubleshoot or replace the monitoring system Before installation c...

Page 4: ...ireless to collect the data and status of the microinverters in the system At the same time Monitor Device connects to the Internet through WIFI Talent MG2 WP or GPRS Talent MG2 GP which realizes the...

Page 5: ...N O Description DRM Port For Australia Ethernet Port USB Port Reset Hole Power Port Antenna 2 4G Installation Hole Description Power LED Communication LED Server Communication LED Inverter Alarm LED S...

Page 6: ...0 101 29 0 2 Wall mounting Desktop mounting 4 LED Signal Maximum Distance Open Space Monitoring Data Limit Communication to Server Sample Rate Signal Communication to Meter Signal Maximum Distance RS4...

Page 7: ...ile the monitor device is installed inside the metal box or under the metal concrete roof extended 2 4G cable or 2 4G sucker antenna will be suggested 2 Insert the SIM Card into the SIM Card Slot pres...

Page 8: ...ket s lower buckle by gently press the lower side of the monitor device until hear the Click Note Make sure the antennas are vertical to the wall 5 Power on the monitor device Note Monitor device coul...

Page 9: ...onfiguration Only Talent MG2 WP 1 Connect the wireless name of MG2 W via computer or mobile phone 2 Open the browser and enter 10 10 100 254 to open the Wi Fi configuration page The username and passw...

Page 10: ...Restart LED Mark LED Color Explanation Monitor device power on or power off Network communication Microinverter communication Fault State LED All LEDs Status Firmware upgrading Description Talent MG2...

Page 11: ...erter system and the monitoring device are working well Step 2 Establish an account 1 Visit the monitor website pro solarmanpv com directly Or enter this monitor website by the official website of TSU...

Page 12: ...Click the Register button and register a new account 1 Login to the platform and find the Network page by Applications Network Please make sure that the monitoring device has already connected to the...

Page 13: ...2 Click Select to input the SN of monitoring device Talent MG2 WP GP 11 www tsun ess com...

Page 14: ...ommunication relationship will be updated in a few minutes 1 Find the Plants page by O M Plants Click Create a Plant to create a new plant 2 Input basic information system information yield informatio...

Page 15: ...lick Network to map the device relationship The communication relationship will be updated in a few minutes 4 All the plants can be viewed and managed in Plants page Talent MG2 WP GP 13 www tsun ess c...

Page 16: ...system layout 1 Find the Layout page by O M Plants plant name Layout Click Click here to edit system layout 2 Drag the components to the right side to finish the physical layout 14 www tsun ess com T...

Page 17: ...below by connecting external control device with a standard RJ 45 connector For Talent MG2 WP GP it can support DRM0 5 6 7 8 if used with TSUN microinverters Mode DRM0 DRM1 DRM2 DRM3 DRM4 DRM5 DRM6 D...

Page 18: ...ght grid type accordingly Single Phase 230V Mainly for residual systems in most countries except North America and South America The phase voltage may vary from 220V to 240V The outputs of microinvert...

Page 19: ...e base on the actual installation requirement Step 3 Confirm the loads capacity for CT and Meter Meter Model DDSU666 60A DTSU666 80A DTSU666 5A SN 10C011XXXXXX 10C013XXXXXX 10C012XXXXXX Description Di...

Page 20: ...Step 4 Install the meter and CT Port 1 Port 2 Port 3 Port 4 Port 7 Port 8 input port connect to the L line output port connect to the L line connect to the N line connect to the N line connect to the...

Page 21: ...f RS485 port connect to the B port of RS485 port Port 1 Port 2 Port 3 Port 4 Port 5 Port 6 Port 7 Port 8 Port 9 Port 10 Port 24 Port 25 connect to the red wire of CT in Phase A connect to the L line o...

Page 22: ...CT arrow pointed to the Grid The picture below indicates the RS485 A Port and B Port on the monitor device When the RS485 cable length is more than 200m use the shorting jumper on the first two ports...

Page 23: ...Zero export Setting page by Applications Zero ex port Setting Please make sure that the monitoring device has already connected to the server Step 6 Set zero export function on the monitor platform Ta...

Page 24: ...TSUNESS All rights reserved All specifications are subject to change without prior notice www tsun ess com sales tsun ess com Building D2 No 555 Chuangye Road Jiaxing Zhejiang Province China TSUNESS C...

Reviews: