29/07/2020 37
Checking the screws
After approximately 2-5 operating hours, all fixing
screws are to be checked for a tight fit. Furthermore,
the fit of the screws and nuts should be checked at
regular intervals (daily)
.
Ball bearings
The ball bearings on the retraction rollers and hack-
ing disc shaft are to be lubricated according to the
maintenance table. The ball bearings are to be test-
ed at least once per year and replaced if necessary.
V-belts
All V-belts are to be checked for the first time after
4 operating hours for tension and tightened if neces-
sary. Furthermore, weekly checks on the belts must
be performed. When purchasing the belts, attention
must be paid to set accuracies i.e. the V-belts may
only be purchased as a set.
Summary of Contents for GM10
Page 42: ...29 07 2020 42 Lubrication plan TS GM 10 M Pull Push or WS 10 14 SP ...
Page 43: ...29 07 2020 43 TS GM 10 M 80km h or WS 10 14 P ...
Page 44: ...29 07 2020 44 TS 150 M or WS 15 27 P ...
Page 45: ...29 07 2020 45 TS 170 190 M or WS 18 35 D ...
Page 46: ...29 07 2020 46 TS 250 M or WS 18 35 DT ...
Page 47: ...29 07 2020 47 TS 350 450 M ...
Page 48: ...29 07 2020 48 TS 550 M ...
Page 55: ...29 07 2020 55 AMP plug ...
Page 67: ...29 07 2020 67 Hydraulic plans Wood shredder with ABS ...
Page 68: ...29 07 2020 68 Wood shredder with ABS EPS ...
Page 69: ...29 07 2020 69 GM10 Pull Push ...
Page 70: ...29 07 2020 70 Electrical diagrams 170M 190M 250M ...
Page 71: ...29 07 2020 71 170M 190M 250M ...
Page 72: ...29 07 2020 72 170M 190M 250M ...
Page 73: ...29 07 2020 73 350M 450M 550M ...
Page 74: ...29 07 2020 74 350M 450M 550M ...
Page 75: ...29 07 2020 75 350M 450M 550M ...
Page 76: ...29 07 2020 76 General EPS electric switching ...
Page 77: ...29 07 2020 77 General EPS electrical switching ...
Page 78: ...29 07 2020 78 GM10M ...
Page 79: ...29 07 2020 79 GM10M ...
Page 80: ...29 07 2020 80 ...