baws002-gbr-0
TSCHAN
®
-S SD-5
- 10 -
Fig. 4
Fig. 3
7.3 Coupling
Installation
•
Remove the elastic buffer ring (Fig.
3, pos. 1).
•
Prior to installation, carefully clean
the bores of the coupling hub, flange
hub, and the shaft ends. The sur-
faces must be clean, dry and free of
grease.
•
For larger couplings use suitable
mounting tools and hoisting devices
such as cranes or pulley blocks.
•
Mount the coupling hub and the
flange hub complete with claw ring
attached in the proper position on
the shaft ends (Fig. 3, pos.2).
Note:
To facilitate mounting, the hubs can be uniformly heated to 80°C to 120°C.
§
Warning!
§
Always wear heat-resistant gloves to protect yourself against
injuries due to hot coupling components!
•
Mount the hub in such a manner that
the shaft end is flush with the inner
bore opening (Fig. 4).
Observe deviant agreements, which
may exist!!
•
When tightening setscrews, secure
them with an adhesive, such as e.g.
Loctite 222, to prevent the screws
from working loose and dropping out.