© Trynex International 2008 L1215
MAXXH — 47
Operating the Spreader
V-Maxx SP-2400H
SP-2400H INTERIOR BAFFLE & INVERTED-V INSTRUCTIONS
•
The SP-2400H uses a multi-function baffle syetm over the auger area.
.
This twin bafle design is used to reduce load on the auger drive train which controls amperage load to the electrical
system.
It must not be removed unless servicing the unit.
•
WARNING: Always disconnect power source before attempting to remove material baffle.
•
There are two covers provided one long and one short. They can be removed in different combinations depending on the
material type or moisture content. Ultimately they aid in controling material flow to the auger area, however for wet sand
both baffles should be removed.
.
The baffle system is also connected to the vibrator link arm assembly to assist with material flow. Make sure vibrator bolts
and link arm hardware are tight before operating spreader
Short Baffle
Long Baffle
Connect To Link Arm
Summary of Contents for SnowEx V-MAXX SP-2400 H
Page 18: ...Trynex International 2008 L1215 MAXXH 18 V Maxx 8500H Hopper Assembly Parts Breakdown...
Page 20: ...Trynex International 2008 L1215 MAXXH 20 V Maxx 9500H Hopper Assembly Parts Breakdown...
Page 22: ...Trynex International 2008 L1215 MAXXH 22 V Maxx 2400H Hopper Assembly Parts Breakdown...
Page 24: ...L1215 Trynex International 2008 MAXXH 24 V Maxx 8500H Frame Assembly Parts Breakdown...
Page 26: ...L1215 Trynex International 2008 MAXXH 26 V Maxx 9500H Frame Assembly Parts Breakdown...
Page 28: ...L1215 Trynex International 2008 MAXXH 28 V Maxx 2400H Frame Assembly Parts Breakdown...
Page 53: ...THIS PAGE INTENTIONALY LEFT BLANK Trynex International 2008 L1215 MAXXH 53...