5
Figure
3
‐
2.5:
Outdoor
unit
typical
concrete
base
structure
design
(unit:
mm)
Figure
3
‐
2.6:
Expansion
bolt
positioning
Table
3
‐
2.1:
Expansion
bolt
spacings
Dimension
(mm)
8,
10,
12HP
14,
16,
18,
20,
22HP
A
740
1090
B
990
1340
C
723
723
D
790
790
2.1.5
Acceptance
and
unpacking
2.1.6
Hoisting
≥80
Outdoor
unit
Concrete
base
h=200
Φ10
Expansion
bolt
Rubber
anti
‐
vibration
pads
Solid
ground
/
surface
200
15×23 long u-shape hole
B
A
C
D
When
units
are
delivered
check
whether
any
damage
occurred
during
shipment.
If
there
is
damage
to
the
surface
or
outside
of
a
unit,
submit
a
written
report
to
the
shipping
company.
Check
that
the
model,
specifications
and
quantity
of
the
units
delivered
are
as
ordered.
Check
that
all
accessories
ordered
have
been
included.
Retain
the
Owner's
Manual
for
future
reference.
Notes
for
installers
Do
not
remove
any
packaging
before
hoisting.
If
units
are
not
packaged
or
if
the
packaging
is
damaged,
use
suitable
boards
or
packing
material
to
protect
the
units.
Hoist
one
unit
at
a
time,
using
two
ropes
to
ensure
stability.
Keep
units
upright
during
hoisting,
ensuring
that
the
angle
to
the
vertical
does
not
exceed
30°.
Notes
for
installers
Rubber
anti
‐
vibration
pads