![truflo TSMP Series Installation, Operation & Maintenance Manual Download Page 50](http://html1.mh-extra.com/html/truflo/tsmp-series/tsmp-series_installation-operation-and-maintenance-manual_1175716050.webp)
50
Revision
8
–
November
2011
NOTE: DO NOT use shaft centers for runout check as they may have been damaged when removing bearings.
SHAFT (6)
Allowable runouts of the fully assembled rotor are listed in
Table 7
(Fig. 46).
Table 7 Shaft and Rotor Runout
Requirements (Abstracted from
Table 15 in API-610 10th Edition)
Flexibility factor, L/D, mm
(in)
>1.9x10
9
(3.0x10)
6
6
Allowable shaft runout,
TIR um (in.)
40 (0.0015)
Component fit to shaft
Interference
Allowable rotor radial
Runout, um (in.) TIR (see
NOTE 1)
60 (0.0025)
Summary of Contents for TSMP Series
Page 3: ...Revision 8 November 2011 3 PAGE SECTION...
Page 37: ...Revision 8 November 2011 37...
Page 46: ...46 Revision 8 November 2011 Assemble is reverse sequence of disassemble...
Page 54: ...54 Revision 8 November 2011 SECTIONAL Drawing of Typical TSMP...
Page 63: ...Revision 8 November 2011 63...