![truflo TSMP Series Installation, Operation & Maintenance Manual Download Page 30](http://html1.mh-extra.com/html/truflo/tsmp-series/tsmp-series_installation-operation-and-maintenance-manual_1175716030.webp)
30
Revision
8
–
November
2011
PREPARATION FOR START-UP
30
CHECKING
ROTATION
30
COUPLING
PUMP
AND
DRIVER
30
LUBRICATING BEARINGS
31
SHAFT SEALING
32
PRIMING PUMP
32
START-UP PRECAUTIONS
33
STARTING PUMP
33
OPERATION
33
GENERAL
CONSIDERATIONS
34
OPERATIONAL
CHECKS
34
OPERATING
AT
REDUCED
CAPACITY
34
OPERATING
UNDER
FREEZING
CONDITIONS
35
SHUTDOWN
35
FINAL ALIGNMENT
35
DOWELING PUMP CASING
36
MOTOR INSTALLATION
36
COLD SERVICE APPLICATION
36
HOT
SERVICE
APPLICATION
36
PREPARATION FOR START-UP
When installing in a potentially explosive
environment, ensure that the motor is properly
certified.
CHECKING ROTATION
1. Lock out power to driver. Remove coupling spacer if
installed.
1
Make sure everyone is clear. Jog driver just
long enough to determine direction of rotation. Rotation
must correspond to arrow on bearing housing.
2
Lock out power to driver before proceeding
with coupling spacer installation.
NOTE: Pump is shipped with coupling spacer
removed.
COUPLING PUMP AND DRIVER
2. Make sure coupling hub is securely fastened to the
driver shaft. (This is a good time to check pump hub
also.)
3. Unlock driver power.
The coupling used in an ATEX classified
environment must be properly certified.
1.
Check the gap between the coupling hubs against
the dimensions shown on the elevation drawing or as
stamped on the coupling hub. For any necessary
adjustment, move the driver not the pump.
Summary of Contents for TSMP Series
Page 3: ...Revision 8 November 2011 3 PAGE SECTION...
Page 37: ...Revision 8 November 2011 37...
Page 46: ...46 Revision 8 November 2011 Assemble is reverse sequence of disassemble...
Page 54: ...54 Revision 8 November 2011 SECTIONAL Drawing of Typical TSMP...