Model 2701-B
5–3
5. PROJECT DATA
If a project has been created, the gauge displays:
Project XXX
¦
Arrows for Scroll
<ENTER> to Select
Use the arrow keys to scroll through the names of the existing
projects. Press
〈
ENTER/START
〉
when the desired project is
displayed. The gauge sets the selected project as active, briefly
displays a confirmation message, and returns to the
Project
menu.
VIEW
The Model 2701-B offers two methods of viewing data. The
operator can either view the last measurement results using the
Recall
function described on page 4–12, or any measurement
results, including project notes, stored in a project file using the
View
function available from the
Project
menu.
To view data stored in a project file, press
〈
2
〉
at the
Project
menu.
The gauge displays:
Prj: XXX
¦
mm/dd/yy hh:mmp
Rec: # UID: XXX
<ENTER> to select
Use the arrow keys to scroll through the project names. Press
〈
ENTER/START
〉
, when the gauge displays the desired project
name. If any measurement data has been stored in the selected
project file, the gauge displays the data for the first measurement.
Five screens of information are displayed for each measurement.
Use the up and down arrows to scroll through the project data.
Press the
〈
ESC
〉
key to return to the project selection screen shown
above.
Summary of Contents for 2701 -B
Page 8: ...viii NOTES ...
Page 12: ...xii NOTES ...
Page 20: ...1 8 NOTES ...
Page 84: ...Appendix B 6 NOTES ...
Page 94: ...Index 6 NOTES ...