Trojan Technologies Aquafine DW Series Installation, Maintenance And Operation Manual Download Page 4

3

safety requirements for

UV equipment

The following safety requirements

directly relate to operator safety. Please

review with all appropriate personnel to

ensure continuous compliance.
These safety requirements are

MANDATORY.
Failure to carefully follow these require-

ments can cause injury to the operator

and damage the UV unit.

1. Release the pressure in the UV treatment chamber

before attempting to remove the protective covers
and sealing items.

2. Disconnect all power to the UV unit before

servicing. The unit operates on high voltage and
should only be serviced by qualified personnel.

3. Do not look at the lighted blue ultraviolet lamp. Do

not operate the ultraviolet lamp outside of the UV
treatment chamber. Exposure can severely burn and
damage eyes and skin.

4. Supply the unit with the correct voltage and

frequency as indicated on the nameplate decal,
ensuring the unit is wired in accordance with local
electrical codes.

5. Properly ground the unit. Failure to comply may

result in severe or fatal electrical shock.

6. Install the unit away from undue vibration that can

damage the electrical components and UV lamps.

7. Ensure all water connections (flanges and compres-

sion nuts) are tightly sealed before applying
pressure to the UV unit. 

Do not stand in a direct

line with the endplate when inspecting for water
leaks; observe from the front or back.

This “Safety Issue” icon marks
all items relating to safety issues.
Please read and adhere to these
comments carefully.

DO NOT

LOOK AT

UV LIGHT

8. Do not allow the unit to overheat by operating

without water flow. Normal operating temperature
for standard UV units is 35° to 100°F (2°-38°C).

9. If the inlet water temperature exceeds 100°F (38°C),

contact the factory for assistance.

10. Do not allow the water temperature to drop below

35°F (2°C).

11. Do not allow the flow rate to exceed the maximum

rated capacity.

12.

DO NOT ELECTRICALLY CYCLE THE UV
UNIT MORE THAN THREE(3) ON/OFF CYCLES IN
A 24-HOUR PERIOD.

13. Before start up, flush the UV unit and discharge

piping to rinse out any debris left from installation.

Summary of Contents for Aquafine DW Series

Page 1: ...perated Aquafine ultraviolet treatment units will provide many years of service DW Series Installation Maintenance and Operation Manual Part No 109 1 This manual covers the preliminary installation op...

Page 2: ......

Page 3: ...Quartz Sleeves 9 10 Installing the Ultraviolet UV Lamps 11 12 Powering Up the Ultraviolet UV Unit 13 Monitoring Devices Lamps Operational Viewport 14 Maintenance Requirements 15 Cleaning the Unit 15...

Page 4: ...l codes 5 Properly ground the unit Failure to comply may result in severe or fatal electrical shock 6 Install the unit away from undue vibration that can damage the electrical components and UV lamps...

Page 5: ...5 Pretreating the water with appropriate filtration and or other devices may be necessary to bring the water quality up to acceptable UV transmission levels Only then should you install and operate th...

Page 6: ...warranty pleasefilloutand mailtheWarrantyRegistrationCardintheback pocketofthismanualandreturntoAquafineCustomer Service The following installation and operating conditions are considered hazardous or...

Page 7: ...our option and returned to sender prepaid Before returning any part contact Aquafine Corporation for return authorization and shipping instructions This guarantee is void if the equipment has not bee...

Page 8: ...cal components and cause premature failure of the UV lamps If your piping system is subject to impulse pressure resulting in a water hammer condition a surge tank or other means must be provided to re...

Page 9: ...aps to isolate any such susceptible material from direct exposure to the ultraviolet light Install the UV light traps to the inlet outlet of the UV treatment chamber prior to the connec tion of any no...

Page 10: ...wly push the sleeve through the chamber 8 Assemble the compression nut and o ring Place the o ring into the internal relief of the compression nut below the threaded area The o ring should fit into th...

Page 11: ...emble the compression nut and o ring Place the o ring into the internal relief of the compression nut below the threaded area The o ring should fit into the com pression nut 9 Place the compression nu...

Page 12: ...ion nut This ensures the lamp is secure within the chamber 8 The lamp pins must be pushed down to fit securely in the lamp socket connector 9 Screw the lamp socket retainer cap clockwise into place ov...

Page 13: ...e hand push the lamp socket boot onto the end of the ultraviolet lamp and connect the opposite lamp socket When properly attached a slight snap can be felt which indicates a proper connection Verify n...

Page 14: ...til a strong chlorine odor is detectable Leave this solution in all lines for at least four hours before purging Before flushing lines proceed to the next step since UV treated water must be used to r...

Page 15: ...p failure buzzer option For single ended units only The buzzer is an optional accessory that is activated when the UV lamp fails to operate Upon such condi tion the LED indicator will automatically tu...

Page 16: ...ays after use to see if any debris or film has settled on the outside If dirty follow these cleaning procedures 1 Turn off the main water to the unit 2 Disconnect the electrical power to the unit 3 Re...

Page 17: ...ballast by pulling it towards you Discard the old or defective ballast 6 Install the new ballast securing it with the bolt removed earlier 7 Tighten the bolt with 5 32 L shaped hex wrench 8 Reconnect...

Page 18: ...spillage 3 After the valve has been left fully open for three and one half minutes reduce the flow to a reasonable stream of water not less than 50 of full flow Continue flowing to drain three additi...

Page 19: ...18517 DW 5 Parts 1 Ballast 120 Volt 18855 2 UV lamps standard SE 254 mauve 19306 3 Quartz sleeves domed 19330 DW 8Single Ended SE Parts 1 UV lamps standard SE 254 mauve 17491 2 Quartz sleeves domed 1...