background image

Parts List

Board L Tube

2pcs 

Board Tube

2pcs

Left Tube

1pc

Right Tube

1pc

Horizontal

Frame Brace 

U Tube

1pc

Left Mounting 

Tube

1pc

Support Tube

2pcs

Right Mounting

Tube

1pc

Ramp Tube

2pcs

Ramp L Tube

2pcs

Ramp U Tube

1pc

Horizontal Tube

2pc

Ramp Chute

1pc

Electronic Scorer

1pc

Mechanical
Scoring Arm

2pcs

Rim

2pcs

Rim Support

Plate

2pcs

Inflation Pump 

With Needle

1pc

 Net

2pcs

Backboard

1pc

M6 x 1mm Thick

Washer

4pcs

M6 x 20mm Bolt

16pcs

M6 x 50mm Bolt

6pcs

M6 x 60mm Bolt

4pcs

M6 x 70mm Bolt

4pcs

M6 Lock Nut

32pcs

Basketball

4pcs

3.5 x 10mm Bolt

4pcs

Electronic Scorer

Face Plate

1pc

Wrench

1pc

M6 x 92mm Bolt

2pcs

Locking Pin

2pcs

Mechanical Arm

Support Plate

2pcs

2pcs

M6 x 2mm Thick

Washer

 

(Pack inside 
EScorer Box)

Allen Wrench

1pc

 

Plastic Pole 
   insert-A

   

2pcs 

 

8pcs

PRE-INSTALLED PARTS

P1

P2

Plastic Pole
   insert-B

Spring Lock

   

8pcs 

P3

Summary of Contents for DOUBLE SHOT BASKETBALL STAND

Page 1: ...DOUBLE SHOT BASKETBALL STAND ...

Page 2: ... Support Plate 2pcs Inflation Pump With Needle 1pc Net 2pcs Backboard 1pc M6 x 1mm Thick Washer 4pcs M6 x 20mm Bolt 16pcs M6 x 50mm Bolt 6pcs M6 x 60mm Bolt 4pcs M6 x 70mm Bolt 4pcs M6 Lock Nut 32pcs Basketball 4pcs 3 5 x 10mm Bolt 4pcs Electronic Scorer Face Plate 1pc Wrench 1pc M6 x 92mm Bolt 2pcs Locking Pin 2pcs Mechanical Arm Support Plate 2pcs 2pcs M6 x 2mm Thick Washer Pack inside EScorer B...

Page 3: ... of the box can be used as your work surface STEP 1 WARNING 1 Do not mix old and new batteries 2 Do not mix alkaline standard carbon zinc or rechargeable ni cad ni mh etc batteries 3 Do not dispose of batteries in fire batteries may explode or leak Attach the Board Tubes 2 to the Left Tube 3 and Right Tube 4 using Spring Lock as shown in FIGURE 1 2 3 4 FIGURE 1 P2 P2 STEP 2 Attach the Support Tube...

Page 4: ...side 7 24 27 2 7 2 24 27 7 FIGURE 3 STEP 4 Attach Horizontal Frame Brace U Tube 5 to tubes from assembly STEP 3 using Bolts 26 and Lock Nuts 27 as shown in FIGURE 4 Attach Horizontal Tube 12 to tubes 2 using Bolts 24 and Lock Nuts 27 as shown in FIGURE 4 Use Wrench 31 and Allen Wrench 36 to tighten all Bolts Tighten but do not overtighten P1 P1 2 2 7 7 8 6 3 4 5 12 24 27 24 27 26 27 27 26 27 27 26...

Page 5: ...mp L Tubes 10 to Ramp Tubes 9 using Spring Locks as shown in FIGURE 5 FIGURE 5 10 10 9 9 8 6 2 2 1 1 39 P2 P2 P2 P2 STEP 6 Attach Rims 17 and Rim Support Plates 18 to the Backboard 21 using Bolts 23 and Lock Nuts 27 as shown in FIGURE 6 Attach Mechanical Scoring Arms 15 and Mechanical Scoring Arm Support Plates 35 to the Backboard 21 using Bolts 23 and Lock Nuts 27 as shown in FIGURE 6 Use Wrench ...

Page 6: ...TEP 8 Slide elastic straps and the sleeve of the Ramp Chute 13 onto the Board L Tube 1 as shown in FIGURE 8 and DETAIL A Slide the Ramp U Tube 11 into the front sleeve of the Ramp Chute 13 as shown in FIGURE 8 and DETAIL B Attach the Front U Tube 11 to the Ramp L Tube 10 using Spring Lock as shown in FIGURE 8 and DETAIL C Elastic Strap Ramp Chute Upper Sleeve 13 1 DETAIL A FIGURE 8 13 DETAIL B 11 ...

Page 7: ... At the bottom hole of the backboard bring the ramp up behind the Tube 12 attach the ramp tabs of Ramp Chute 13 using Bolts 25 and Lock Nuts 27 as shown in FIGURE 9 and DETAIL F Use Wrench 31 and Allen Wrench 36 to tighten Bolts Tighten but do not overtighten 1 FIGURE 9 DETAIL E DETAIL D DETAIL F 13 21 25 22 27 27 25 21 1 13 12 24 27 13 12 11 vuVvmm STEP 10 Connect the Sensor Wire of Mechanical Sc...

Page 8: ...il the game is in the storage position as shown in FIG 12 vuVvmm jvu yvs pyl pzp vy Insert the Lock Pins 33 back into the Mounting Tubes 6 8 locking the basketball game into the storage position 33 FIGURE 12 Trouble Shooting Game won t turn on 1 Make sure switch on scorer is in the on position 2 Make sure switch mechanical scoring arm wires are in the home and visitor slots on the scorer Game shut...

Reviews: