Concentric thermostatic mixer valve
1
Appropriate
fitting
8mm
13mm
Finished surface
Fig.
Fig.
FIttInG tHE BULKHEaD oR
FIXED HEaD PIPEWoRK
Complete the outlet pipework ending in a 15mm
x ½” BSP female thread elbow
(fig.)
.
Note: This fitting is not supplied as variations in
installations require the selection of a suitable
solder or compression fitting.
To install the fixed showerhead please refer to the
fitting instruction supplied with it.
To install the bulkhead screw the supplied male
connector into the female fitting
(fig.)
using
PTFE tape to give a watertight joint.
Note: The male-thread connector supplied has
a shoulder. If fitting into a flush wall, make an
additional 8mm allowance for this shoulder at
the finished surface. The connector can be cut to
size if required.
The threaded connector should protrude from
the finished wall surface between 8mm and 13mm.
LEaK tEStInG
Direct the outlet of the mixer to waste. Open the
isolating valves to the shower and check for leaks.
Remedy any leaks found.
maKInG GooD
Make good the wall and complete the tiling.
• This product is supplied with a tiling shroud
to prevent damage to the product.
• If the tiles are accurately cut, then the
faceplate will seal around the hole in the
tiles, and the valve unit will be able to be
removed from the wall without the need to
break any tiles.
Make sure the grout lines around the valve are
flush with the tiles in order to provide a smooth
sealing surface for the coverplate.