11
Triple Solar assembly instruction PVT heat pump panels UK January 2021
6. For the next row, consider the vertical distance between the rows of heat pump panels.
Distance between panels at least 40mm.
7. Connect the next mounting rail with the mounting rail interconnector. See Figure 4.1-e
Figure 3.2-e Pitched roof, connecting mounting rails
5. Preparing a flat roof
See the Sunbeam installation manual supplied with the Sunbeam flat roof mounting
system
.
Figure 3.2-d Pitched roof mounting instruction roof brackets (sizes in mm).