12
D01-060en202008 Manual nanoFlu
Use
Calibration
Malfunction &
Maintenance
Introduction
General
Information
FA
Q
Technical Data
W
arranty
Customer
Service
Contact
Keyword
Index
Accessories
Commis-
sioning
Commissioning
//
nanoFlu
3 Commissioning
This chapter deals with the commissioning of the sensor. Please pay particular attention to this section and
follow the safety precautions to protect the sensor from damage and yourself from injury.
Before the sensor is put into operation, it is important to ensure that it is securely attached and all connections
are connected correctly.
3.1 Electrical Installation
3.1.1 SubConn 8-pin Connector
1. Ground (Power + Ser. Interface)
2. RS232 RX / RS485 A (commands)
3. RS232 TX / RS485 B (data)
4. Power (12...24 VDC)
5. ETH_RX-
6. ETH_TX-
7.
8.
Connect the male end of the connecting cable into the connector by making the pins align with the slots of the
cable.
Summary of Contents for nanoFlu
Page 1: ...nanoFlu OPERATING INSTRUCTIONS ...
Page 2: ......