Date: 2019.9.24 Doc No: PS-M-0691 Ver. B Page - 19 - of 27
Remove the bottom connector
parts. Connector parts: M8
Nut, spring washer and
washer.
STEP 2: Install the clamp
Put the clamp bolts into the
installation holes, and then
tighten the nuts.
Repeat, put all clamp on the
rail, keep the distance
between two clamps can
install the PV modules. (about
1m between each clamp)
The 60pcs module can be
installed with 4 clamps, and
the 72pcs module can be
installed with 6 clamps
STEP 3: Install the PV modules
Insert the PV module into the
clamp, and make sure the
module edge touch to the
EPDM closely and then
tighten the nut with uniform
torque values using a qualified
torque wrench to ensure the
double glass module is firmly
secured. Trina suggests using
M8 bolts to affix the double
glass modules onto the clamp.
The torque for the M8 nuts is
16N∙m~20N∙m
60
72