Date: 2019.9.24 Doc No: PS-M-0691 Ver. B Page - 10 - of 27
1. Lift up the module; ensure
the bolt over the racking.
2. Aim the bolt to racking.
3. Insert the bolt into the
holes
;
Step 3: Push the modules to the right position
Push the PV modules to the
right position, so that the
bottom two screws are in the
middle of the border screw
slot.
Step 4: Fixed the bolts (Torque requirement of M8 bolts: 16~20Nm; )
flat washer, spring washer and
the Nuts are placed in turn,
and then tighten the nut.
Repeat this step and finish the
4 holes.
(16N·m~20N·m)
*Note: Don't place the screws in the slot
1. Lift up the modules
2. Insert the bolt into the holes
UP
DOWN