24
immediately above the tank, separate it from the concrete surrounding the tank by a compressible
material.
5.11
Electrical requirements
Important:
•
Please ensure the electrical installation complies with all national regulations and
requirements.
•
Electrical installations must be carried out by a qualified electrician.
The customers’ minimum responsibility shall consist in the provision of:
•
The power supply SWA cable must be suitably sized and comply with all national regulations
and requirements. The sizing of the cable is the responsibility of a qualified electrician.
Note: In typical domestic installations, a single run of 1.5mm² three core (two conductors plus
earth conductor) steel wire armoured (SWA) cable is required from the
customer’s
distribution cabinet to the tank unit socket box.
•
Cable protection via 10-amp MCB protected by (RCD), rated 230V, 30mA.
•
The cable armour to the main earth must be properly bonded.
•
Never disconnect the power to the air blower. It is imperative that it be running 24 hours a day,
every day.
•
If you require a riser at a later date, the qualified electrical must supply an additional 1m of the
power supply SWA cable. This additional length of cable should be coiled and hung underneath
the manhole access cover as shown in the following image.
Summary of Contents for Novo UK10
Page 4: ...3...
Page 5: ...4...
Page 10: ...9...
Page 11: ...10...
Page 27: ...26 UK18 UK24 Control Panel No 209116...
Page 28: ...27 UK30 UK36 UK42 UK50 Control Panel No 209111...
Page 29: ...28 5 11 1 2 Tricel Novo Pumped Outlet UK6 UK8 UK10 UK12 UK18 UK24 Control Panel No 209101...
Page 30: ...29 UK30 UK36 UK42 UK50 Control Panel No 209112...
Page 43: ...42...