5.5.1.2
Excavation: Depth
The depth that the Tricel Novo must be installed is determined by the outlet pipe from the source
of the wastewater.
Please refer to section 5.9 ‘Risers’ to determine the maximum invert for the Tricel Novo.
Allowances
for maximum inverts must be made when the connecting sewer system is being designed by a qualified
individual. The Tricel Novo is not suitable where a deeper installation is required.
Outlined below, are the minimum distances (mm) that the excavation dimensions must exceed the
tank dimensions for both concrete and gravel installations. Please refer to section 3.1
, ‘Dimensions’
to view all tank dimensions.
Note: Ground instability, e.g. running sand may necessitate over-excavation and stabilization with
hard core or blinding concrete.
Tank width (mm)
“a” minimum (mm)
“b” minimum (mm)
Dry Site
1640
250
250
Wet Site
1640
250
300
Summary of Contents for Novo UK10
Page 4: ...3...
Page 5: ...4...
Page 10: ...9...
Page 11: ...10...
Page 27: ...26 UK18 UK24 Control Panel No 209116...
Page 28: ...27 UK30 UK36 UK42 UK50 Control Panel No 209111...
Page 29: ...28 5 11 1 2 Tricel Novo Pumped Outlet UK6 UK8 UK10 UK12 UK18 UK24 Control Panel No 209101...
Page 30: ...29 UK30 UK36 UK42 UK50 Control Panel No 209112...
Page 43: ...42...