14
Installation space
Mounting the unit
When installing the outdoor unit, please refer to “MCS Installation guidelines” to select an appropriate location.
1.
Check the strength and level of the installation ground so that the unit will not cause any operating vibration or
noise after installation.
2.
Prepare 4 sets of M8 foundation bolts, nuts, and washers each.
3.
Fix the unit securely by means of the foundation bolts in accordance with the foundation drawing. It is best to
screw in the foundation bolts until their length remains 20mm above the foundation surface.