10
“EGA Spółka z o.o.” Spółka Komandytowa ul. Rzeczna 1, Nowa Wieś Rzeczna
83-
200 Starogard Gdański tel/fax:+48 58 56 300 80
with washers and screw the nut on the other side. Also tighten the bolt M8x55 with washer
into the nut in the frame. Tighten firmly with a wrench.
Turn the frame and attach the support to the wheels (9) as shown in the figure. Insert and
tighten the screws.
Make sure all nuts and bolts are tight.
Assembling the lower forecastle.
Be careful with the help of two people set
the lower forecastle (10) with reference to
the arc frame as shown in the figure.
On each side of the holes align with
bearing and insert the bolts, nuts and
washers. Tighten the bolts with a wrench.
Rotary handle
1. Gently slide the lock plate on the axis
of a large diameter as shown in the
figure. Secure with two screws M8x25 and washers.
2. Screw the bolt into the pipe M8H50 rotary handle. Insert the spring washer and then the
tube. Hold the spring finger, put the handle on the shaft. Press the handle down until the
holes in the shaft and tube rotary handle not match. Insert the bolt M10x70, washers and
lock the two nuts. The spring rate adjustable bolt M8x 50.