Instructions for Use and Maintenance 2452H (1402)
trejonindustries.se
23
23
Breddningsving
en monteras
på insidan av
maskinen
4.2 Maintenance schedule
Position
Interval Type
Number
Note
All screws and bolts
8 h
Check
The whole
equipment
Check that all screws and bolts
are properly tightened and not
loose.
Wearing edge
Daily
Check
1 pcs
Check the wearing edge for wear.
Turn over or replace as needed.
Cross shaft
40 h
Grease
1 pcs
NLGI2 EP
Shear bolt coupling
40 h
Grease
2 pcs
NLGI2 EP
Auger
40 h
Grease
2 pcs /
auger
NLGI2 EP
Transmission chain
40 h
Oil
1 pcs
Engine oil 10W40
Turntable gear
40 h
Grease
2 pcs
NLGI2 EP
Chain tensioner
40 h
Adjust-
ment
1 pcs
Check the tension. You should be
able to push the chain down
about 7mm. The auger should
run smoothly without any noise
from the chain.
Gearbox
40 h
Control
1 pcs
Visually check of the oil level, fill
if needed.
Oil SAE 80W/90 API GL4/GL5,
Industrial gear oil ISO VG 220
Gearbox
At first
50 h
Oil change 4 litre
Oil SAE 80W/90 API GL4/GL5,
ISO VG 220
Gearbox
500 h /
yearly
Oil change 4 litre
Oil SAE 80W/90 API GL4/GL5,
ISO VG 220
When lubricating use low temperature grease. These intervals are to be used for normal usage.
Always lubricate after cleaning with water.
4.3 Before the snowy season
All the above points (chapter 4: Service and maintenance) are to be done. Equipment well
serviced lasts longer.
4.4 After the snowy season
After the season, the equipment must be thoroughly cleaned, and then greased and serviced.
When the machine is dry, we suggest that you cover the parts were the paint has worn away
with a thin coating of oil. Store the snow blower in a dry storage.
4.5 Gear box oil check and change
Check oil level with cold gear box and level machine. Oil level should reach the lower part of the
glass. If necessary add recommended oil through the breather on the top of the gear box.