![Travis Industries Travis DVL Owner'S Manual Download Page 29](http://html.mh-extra.com/html/travis-industries/travis-dvl/travis-dvl_owners-manual_1154144029.webp)
2 8
Installation
(for qualified installers only)
Travis Industries
4 0 2 0 8 1 2
9 3 5 0 8 1 1 0
Vertical Terminations with 2 Vertical 90° Elbows (Top Vent Configuration)
The termination must fall within the shaded area shown in the chart. Use the indicated restrictor position.
AAAAAAAAAAAAAAAAAA
AAAAAAAAAAAAAAAAAA
AAAAAAAAAAAAAAAAAA
AAAAAAAAAAAAAAAAAA
AAAAAAAAAAAAAAAAAA
AAAAAAAAAAAAAAAAAA
AAAAAAAAAAAAAAAAAA
AAAAAAAAAAAAAAAAAA
AAAAAAAAAAAAAAAAAA
AAAAAAAAAAAAAAAAAA
AAAAAAAAAAAAAAAAAA
AAAAAAAAAAAAAAAAAA
AAAAAAAAAAAAAAAAAA
AAAAAAAAAAAAAAAAAA
AAAAAAAAAAAAAAAAAA
AAAAAAAAAAAAAAAAAA
AAAAAAAAAAAAAAAAAA
AAAAAAAAAAAAAAAAAA
AAAAAAAAAAAAAAAAAA
AAAAAAAAAAAAAAAAAA
AAAAAAAAAAAAAAAAAA
AAAAAAAAAAAAAAAAAA
5 feet
10 feet
(min.)
15 feet
20 feet
25 feet
30 feet
0 feet
40' (max)
5 feet
10 feet
15 feet
0 feet
5 feet
10 feet
15 feet
24'(max)
15 feet
20 feet
25 feet
30 feet
0 feet
0 feet
NOTE:
Horizontal sections require a 1/4" rise every 12" of travel.
10 feet
(min.)
40' (max)
24'(max)
Restrictor
Position # 1
5 feet
NOTE:
2' minimum
before first
elbow.
NOTE:
One 45° or 90° elbow may be used between horizontal
sections. Horizontal length is calculated by adding each
horizontal run together.
35 feet
35 feet
20 feet
20 feet