![Travis Industries Travis DVL Owner'S Manual Download Page 12](http://html.mh-extra.com/html/travis-industries/travis-dvl/travis-dvl_owners-manual_1154144012.webp)
Installation
(for qualified installers only)
1 1
Travis Industries
4 0 2 0 8 1 2
9 3 5 0 8 1 1 0
Facing Detail
Access Door
AAAAA
AAAAA
AAAAA
AAAAA
AAAAA
AAAAA
AAAAA
AAAAA
AAAAA
AAAAA
1"
Face
1"
Glass
1/8"
Air Space
AAAA
AAAA
AAAA
AAAA
AAAA
AAAA
Detail of
Faceplate
NOTE: The approximate overlap along the top of the face is:
Do not tuck tile underneath the faceplate on the
bottom (there will be a 1/8" air space below the
access door). You may do this on the sides and
top, but not on the bottom.
Discovery, Rosario
Heritage Bay
Salish Bay
Cambridge
FPX Arched or Rect.
5/8"
1/4"
1"
1/2"
1-1/8"
Discovery, Rosario
Heritage Bay
Salish Bay
Cambridge
FPX Arched or Rect.
1-3/8"
1-1/4"
1/4"
1-5/8"
7/8"
•
To achieve a facing that is flush with the drywall to the side of the fireplace, recess the framing directly
next to the fireplace. See the illustration below.
Fireplace
1"
1/2" Drywall
AAAA
AAAA
AAA
AAA
1/2" Concrete Board
3/8" Tile
This 2x4 is recessed 3/8"
to make a flush facing
Fireplace
1/2" Drywall
AAAA
AAAA
AAA
AAA
1/2" Concrete Board
3/8" Tile
The tile overlaps the drywall
for an overlap facing
Faceplate
1"
TOP
VIEW
Faceplate