Page 32
Removal Instructions (
Unplug the Heater First!
)
Printed 3/18/98
Travis Industries Pellet Stove Troubleshooting Guide (
1994)
C
ONVECTION
B
LOWER
1. Access the left side of the heater.
2. Disconnect the two wires leading to the convection blower
3. Unscrew the nut that holds the convection blower in place with a 7/16" wrench (some models use a bolt -
the instructions remain the same).
Unscrew this nut with a 7/16" wrench
(some models use a bolt, the
instructions remain the same).
Hopper
Convection
Blower
7
/16
" Wrench
Flow
Switch
NOTE
: the hole in the
clamp is placed away
from the blower.
Control
Box
Blower
Clamp
NOTE
: the 7/8" black
self-adhesive gasket
wraps around these
two edges and lays
flat along the other
two edges.
TOP VIEW
Convection
Blower
4. The blower is removed by swinging it inwards and sliding it out (see the illustration below). When
replacing the blower, make sure the gasket is intact and the clamp is correctly oriented.
C
ONTROL
B
OX
(
INCLUDES
F
USES
)
1.
Access the left side of the heater.
2.
Disconnect the two molex connectors that attach to the side of the control box.
3.
Remove the two screws that attach the control box with a 5/16" nutdriver.
Remove these two screws to
remove the control box (5/16"
nutdriver, 1/4" on the 900 PS ).
Unplug the two molex
connectors first.
Control Box
Hopper
Convection
Blower
5/16
" Nutdriver
To open the control
box remove these
two screws with a
phillips head
screwdriver.
Power Cord
5 Amp Fuse (twist to
remove - extra fuses are
inside the control box)
Phillips
Screwdriver
NOTE
:
To access the internal components of the control box, remove the cover plate on the control
box. It is held in place with two phillips-head screws.
Summary of Contents for 400 PI
Page 46: ......