Pre-Installation
The checklist listed below is a summary of the steps
required to successfully install a Voyager Commercial
rooftop unit. This checklist is intended to acquaint the
installing personnel with what is required in the
installation process. It does not replace the detailed
instructions called out in the applicable sections of this
manual.
General Unit Requirements
Downflow/Upflow Models
•
An optional roof curb, specifically designed for the
Voyager commercial rooftop units is available from
Trane. The roof curb kit must be field assembled
and installed according to the latest edition of the
curb installation guide.
•
Assemble and install the roof curb, including
necessary gaskets. Make sure the curb is level.
•
Install and secure the ductwork to the curb.
All Units
•
Check unit for shipping damage and material
shortage. (Refer to
).
•
Rigging the unit. Refer to
.
•
Placing the unit on curb; check for levelness.
•
Ensure that the unit-to-curb seal is tight and without
buckles or cracks.
•
Install an appropriate drain line to the evaporator
condensate drain connections, as required. Refer to
•
Service Valve Option; See
•
Return/Fresh-air damper adjustment. Refer to
“Economizer (O/A) Dampers,” p. 84
.
•
Exhaust Fan Damper Stop Adjustment. Refer to
Exhaust Damper Adjustment figures, beginning
with
Electrical Requirements
W
WA
AR
RN
NIIN
NG
G
P
Prro
op
pe
err F
Fiie
elld
d W
Wiirriin
ng
g a
an
nd
d G
Grro
ou
un
nd
diin
ng
g
R
Re
eq
qu
uiirre
ed
d!!
F
Fa
aiillu
urre
e tto
o ffo
ollllo
ow
w cco
od
de
e cco
ou
ulld
d rre
essu
ulltt iin
n d
de
ea
atth
h o
orr
sse
erriio
ou
uss iin
njju
urry
y..
A
Allll ffiie
elld
d w
wiirriin
ng
g M
MU
US
ST
T b
be
e p
pe
errffo
orrm
me
ed
d b
by
y q
qu
ua
alliiffiie
ed
d
p
pe
errsso
on
nn
ne
ell.. IIm
mp
prro
op
pe
errlly
y iin
nsstta
alllle
ed
d a
an
nd
d g
grro
ou
un
nd
de
ed
d
ffiie
elld
d w
wiirriin
ng
g p
po
osse
ess F
FIIR
RE
E a
an
nd
d E
EL
LE
EC
CT
TR
RO
OC
CU
UT
TIIO
ON
N
h
ha
azza
arrd
dss.. T
To
o a
av
vo
oiid
d tth
he
esse
e h
ha
azza
arrd
dss,, y
yo
ou
u M
MU
US
ST
T ffo
ollllo
ow
w
rre
eq
qu
uiirre
em
me
en
nttss ffo
orr ffiie
elld
d w
wiirriin
ng
g iin
nsstta
alllla
attiio
on
n a
an
nd
d
g
grro
ou
un
nd
diin
ng
g a
ass d
de
essccrriib
be
ed
d iin
n N
NE
EC
C a
an
nd
d y
yo
ou
urr llo
occa
all//
sstta
atte
e//n
na
attiio
on
na
all e
elle
eccttrriicca
all cco
od
de
ess..
•
Verify that the electrical power supply
characteristics comply with the unit nameplate
specifications.
•
Inspect all control panel components; tighten any
loose connections.
•
Connect properly sized and protected power supply
wiring to a field supplied/installed disconnect and
unit power terminal block HTB1, or to the optional
unit-mounted disconnect switch.
•
Properly ground the unit.
Field Installed Control Wiring
Refer to
and
Complete the field wiring connections for the constant
volume and variable air volume controls as applicable.
Refer to
.
IIm
mp
po
orrtta
an
ntt:: All field-installed wiring must comply with
NEC and applicable local codes.
Gas Heat Requirements
Refer to
.
•
Gas supply line properly sized and connected to the
unit gas train.
•
All gas piping joints properly sealed.
•
Drip leg Installed in the gas piping near the unit.
•
Gas piping leak checked with a soap solution. If
piping connections to the unit are complete, do not
pressurize piping in excess of 0.50 psig or 14 inches
w.c. to prevent component failure.
•
Main supply gas pressure adequate.
•
Flue Tubes clear of any obstructions.