22
CVHH-SVX001G-EN
Installation: Mechanical
Operating Environment
IIm
mp
po
orrtta
an
ntt::
•
The standard chiller is designed for
indoor use only and as such has NEMA
Type 1 or IP 20 enclosures.
•
For chillers in unheated equipment
rooms, contact your local Trane Service
Agency for methods to ensure that the
oil temperature is maintained suitable
for proper operation of the chiller.
N
NO
OT
TIIC
CE
E
E
Eq
qu
uiip
pm
me
en
ntt F
Fa
aiillu
urre
e!!
U
Un
niitt o
op
pe
erra
attiin
ng
g a
att a
am
mb
biie
en
ntt tte
em
mp
pe
erra
attu
urre
ess e
ex
xcce
ee
ed
diin
ng
g
1
10
04
4°°F
F ((4
40
0°°C
C)) cco
ou
ulld
d rre
essu
ulltt iin
n A
AF
FD
D//sstta
arrtte
err
cco
om
mp
po
on
ne
en
ntt d
da
am
ma
ag
ge
e d
du
ue
e tto
o tth
he
e p
pa
an
ne
ell’’ss iin
na
ab
biilliitty
y tto
o
d
diissssiip
pa
atte
e h
he
ea
att a
ad
de
eq
qu
ua
atte
elly
y.. F
Fo
orr C
CD
DH
HF
F,, C
CD
DH
HG
G,, C
CV
VH
HE
E,,
C
CV
VH
HF
F,, C
CV
VH
HG
G,, C
CV
VH
HL
L,, C
CV
VH
HM
M,, a
an
nd
d C
CV
VH
HS
S C
Ce
en
nT
Trra
aV
Va
acc
cch
hiilllle
errss,, u
un
niittss o
op
pe
erra
attiin
ng
g a
att tth
he
esse
e tte
em
mp
pe
erra
attu
urre
ess
cco
ou
ulld
d a
allsso
o ffa
attiig
gu
ue
e tth
he
e u
un
niitt’’ss rru
up
pttu
urre
e d
diisskk,, cca
au
ussiin
ng
g
iitt tto
o b
brre
ea
akk a
att a
a rre
ed
du
ucce
ed
d rre
effrriig
ge
erra
an
ntt p
prre
essssu
urre
e ((<
<1
15
5
p
pssiig
g [[<
<1
10
03
3..4
4 kkP
Pa
aG
G]]))..
IIff a
an
ny
y o
off tth
he
esse
e a
ad
dv
ve
errsse
e o
op
pe
erra
attiin
ng
g cco
on
nd
diittiio
on
nss a
arre
e
p
prre
esse
en
ntt,, tta
akke
e n
ne
ecce
essssa
arry
y a
accttiio
on
n tto
o iim
mp
prro
ov
ve
e tth
he
e
e
eq
qu
uiip
pm
me
en
ntt rro
oo
om
m e
en
nv
viirro
on
nm
me
en
ntt..
To ensure that electrical components operate properly,
do NOT locate the chiller in an area exposed to dust,
dirt, corrosive fumes, or excessive heat and humidity.
The ambient temperature range for chiller operation is
34°F to 104°F (1.1°C to 40°C).
Foundation Requirements
Chiller mounting surface must be:
•
rigid non-warping mounting pads or a concrete
foundation, and
•
able to support the chiller at its full operating
weight (including completed piping and full
operating charges of refrigerant, oil, and water).
For proper unit operation, the chiller must be level
within 1/16 in. (1.6 mm) over its length and width when
set into place on the mounting surface.
and
show
approximate weights for various chiller sizes and
options in pounds and kilograms, respectively.
N
No
otte
e:: For specific weight information, refer to the unit
submittal package.
IIm
mp
po
orrtta
an
ntt:: Trane will not assume responsibility for
equipment problems resulting from an
improperly designed or constructed
foundation.
Rigging
Lifting is the recommended method for moving
chillers. Suggested lifting arrangements for standard
units are described in
“Standard Chiller Lift,” p. 22
.
N
No
otte
e:: The lifting beam used for CenTraVac
™
chillers
must be at least long.
W
WA
AR
RN
NIIN
NG
G
H
He
ea
av
vy
y O
Ob
bjje
ecctt!!
F
Fa
aiillu
urre
e tto
o ffo
ollllo
ow
w iin
nssttrru
uccttiio
on
nss b
be
ello
ow
w cco
ou
ulld
d rre
essu
ulltt iin
n
u
un
niitt d
drro
op
pp
piin
ng
g w
wh
hiicch
h cco
ou
ulld
d rre
essu
ulltt iin
n d
de
ea
atth
h o
orr
sse
erriio
ou
uss iin
njju
urry
y,, a
an
nd
d e
eq
qu
uiip
pm
me
en
ntt o
orr p
prro
op
pe
errtty
y--o
on
nlly
y
d
da
am
ma
ag
ge
e..
E
En
nssu
urre
e tth
ha
att a
allll tth
he
e lliiffttiin
ng
g e
eq
qu
uiip
pm
me
en
ntt u
usse
ed
d iiss
p
prro
op
pe
errlly
y rra
atte
ed
d ffo
orr tth
he
e w
we
eiig
gh
htt o
off tth
he
e u
un
niitt b
be
eiin
ng
g
lliifftte
ed
d.. E
Ea
acch
h o
off tth
he
e cca
ab
blle
ess ((cch
ha
aiin
nss o
orr sslliin
ng
gss)),, h
ho
oo
okkss,,
a
an
nd
d ssh
ha
acckklle
ess u
usse
ed
d tto
o lliifftt tth
he
e u
un
niitt m
mu
usstt b
be
e cca
ap
pa
ab
blle
e
o
off ssu
up
pp
po
orrttiin
ng
g tth
he
e e
en
nttiirre
e w
we
eiig
gh
htt o
off tth
he
e u
un
niitt.. L
Liiffttiin
ng
g
cca
ab
blle
ess ((cch
ha
aiin
nss o
orr sslliin
ng
gss)) m
ma
ay
y n
no
ott b
be
e o
off tth
he
e ssa
am
me
e
lle
en
ng
gtth
h.. A
Ad
djju
usstt a
ass n
ne
ecce
essssa
arry
y ffo
orr e
ev
ve
en
n u
un
niitt lliifftt..
N
NO
OT
TIIC
CE
E
W
Wiirriin
ng
g D
Da
am
ma
ag
ge
e!!
D
Da
am
ma
ag
ge
e tto
o u
un
niitt w
wiirriin
ng
g cco
ou
ulld
d rre
essu
ulltt iin
n e
eq
qu
uiip
pm
me
en
ntt
ffa
aiillu
urre
e..
C
Ca
arre
e m
mu
usstt b
be
e tta
akke
en
n d
du
urriin
ng
g rriig
gg
giin
ng
g,, a
asssse
em
mb
blly
y a
an
nd
d
d
diissa
asssse
em
mb
blly
y tto
o a
av
vo
oiid
d d
da
am
ma
ag
giin
ng
g u
un
niitt w
wiirriin
ng
g..
Standard Chiller Lift
W
WA
AR
RN
NIIN
NG
G
P
Prro
op
pe
err D
Diia
am
me
ette
err C
Clle
ev
viiss R
Re
eq
qu
uiirre
ed
d tto
o
L
Liifftt U
Un
niittss!!
F
Fa
aiillu
urre
e tto
o ffo
ollllo
ow
w iin
nssttrru
uccttiio
on
nss b
be
ello
ow
w cco
ou
ulld
d rre
essu
ulltt iin
n
d
de
ea
atth
h o
orr sse
erriio
ou
uss iin
njju
urry
y..
A
A cclle
ev
viiss w
wiitth
h a
a 2
2..2
25
5--iin
n.. ((5
5..7
72
2--ccm
m)) d
diia
am
me
ette
err p
piin
n
M
MU
US
ST
T b
be
e u
usse
ed
d tto
o lliifftt tth
he
esse
e u
un
niittss.. U
Ussiin
ng
g a
a ssm
ma
alllle
err
cclle
ev
viiss w
wo
ou
ulld
d cca
au
usse
e tto
oo
o m
mu
ucch
h ssttrre
essss tto
o tth
he
e 2
2..2
25
5--iin
n..
((5
5..7
72
2--ccm
m)) lliiffttiin
ng
g h
ho
olle
ess w
wh
hiicch
h cco
ou
ulld
d rre
essu
ulltt iin
n p
pu
ullll--
o
ou
utt o
off tth
he
e lliiffttiin
ng
g h
ho
olle
ess cca
au
ussiin
ng
g tth
he
e u
un
niitt tto
o d
drro
op
p
ffrro
om
m tth
he
e rriig
gg
giin
ng
g..
1. Insert clevis connections at the points indicated in
the following figure. A 2.5 in. (63.5 mm) diameter
lifting hole is provided at each of these points.
2. Attach the lifting chains or cables.
3. Once the lifting cables are in place, attach a safety
chain or cable between the first-stage casing of the
compressor and the lifting beam.
IIm
mp
po
orrtta
an
ntt:: There should NOT be tension on this
safety cable; the cable is used only to
prevent the unit from rolling during the
lift.
Summary of Contents for CVHH CenTraVac
Page 126: ...126 CVHH SVX001G EN N No ot te es s ...