CVHH-SVX001G-EN
121
Appendix C: CVHH CenTraVac
™
™
Chiller Start-up Tasks
to be Performed by Trane
W
WA
AR
RN
NIIN
NG
G
S
Sa
affe
etty
y A
Alle
errtt!!
F
Fa
aiillu
urre
e tto
o ffo
ollllo
ow
w iin
nssttrru
uccttiio
on
nss b
be
ello
ow
w cco
ou
ulld
d rre
essu
ulltt iin
n
d
de
ea
atth
h o
orr sse
erriio
ou
uss iin
njju
urry
y..
IIn
n a
ad
dd
diittiio
on
n tto
o tth
he
e ffo
ollllo
ow
wiin
ng
g tta
asskkss,, y
yo
ou
u M
MU
US
ST
T::
••
F
Fo
ollllo
ow
w a
allll iin
nssttrru
uccttiio
on
nss iin
n tth
he
e u
un
niitt’’ss
IIn
nsstta
alllla
attiio
on
n,, O
Op
pe
erra
attiio
on
n,, a
an
nd
d M
Ma
aiin
ntte
en
na
an
ncce
e
m
ma
an
nu
ua
all,, iin
nccllu
ud
diin
ng
g w
wa
arrn
niin
ng
gss,, cca
au
uttiio
on
nss,, a
an
nd
d
n
no
ottiicce
ess..
••
P
Pe
errffo
orrm
m a
allll rre
eq
qu
uiirre
ed
d tta
asskkss iin
n a
an
ny
y a
ap
pp
plliicca
ab
blle
e
S
Se
errv
viicce
e A
Alle
errttss a
an
nd
d S
Se
errv
viicce
e B
Bu
ulllle
ettiin
nss..
••
R
Re
ev
viie
ew
w a
an
nd
d u
un
nd
de
errsstta
an
nd
d a
allll iin
nffo
orrm
ma
attiio
on
n
p
prro
ov
viid
de
ed
d iin
n S
Su
ub
bm
miitttta
allss a
an
nd
d D
De
essiig
gn
n
S
Sp
pe
ecciiffiicca
attiio
on
nss..
1. G
Ge
en
ne
erra
all
Inspect chiller for damage (shipping or rigging).
Verify and record unit nitrogen holding charge
pressure.
Inspect water piping for proper installation.
Inspect strainers, flow sensing devices,
isolation valves, pressure gauges,
thermometer wells, flow balancing valves,
vent cocks, and drains.
Inspect cooling tower piping.
Verify proper clearances.
Power wiring meets size requirement.
Verify proper voltage and amperage rating.
Verify proper foundation installation.
Verify unit isolator pads/springs have been
installed.
Verify low voltage circuits are isolated from
high voltage circuits.
Check equipment room for ventilation,
refrigerant monitor, rupture disk piping, and
Personal Protective Equipment (PPE).
N
No
otte
e:: All conditions which do not conform to the
established requirements for unit installation
MUST be corrected prior to start-up. Any non-
conforming condition which is not corrected
prior to start-up must be noted in the
Non-
Compliance Form
(PROD-ADF001*-EN) by the
start-up technician; this information must also be
signed by responsible site personnel before
start-up and the completed
Non-Compliance
Form
will become part of the start-up record,
submitted with a
Start-up Check Sheet
and a
Chiller Service Report
.
2. P
Prre
e--S
Stta
arrtt O
Op
pe
erra
attiio
on
nss
Verify nitrogen holding charge.
Calibrate the high pressure cutout control
(HPC).
Meg compressor motor.
Check condenser installation.
Check evaporator installation.
N
NO
OT
TIIC
CE
E
D
Do
o N
No
ott A
Ap
pp
plly
y E
Elle
eccttrriicca
all P
Po
ow
we
err tto
o
a
a U
Un
niitt iin
n a
a V
Va
accu
uu
um
m!!
F
Fa
aiillu
urre
e tto
o ffo
ollllo
ow
w iin
nssttrru
uccttiio
on
nss b
be
ello
ow
w cco
ou
ulld
d
rre
essu
ulltt iin
n m
mo
otto
orr a
an
nd
d cco
om
mp
prre
esssso
orr d
da
am
ma
ag
ge
e..
D
Do
o n
no
ott a
ap
pp
plly
y e
elle
eccttrriicca
all p
po
ow
we
err tto
o a
a m
mo
otto
orr iin
n a
a
v
va
accu
uu
um
m..
F
Fo
orr u
un
niittss w
wiitth
h iin
nssiid
de
e--tth
he
e--d
de
elltta
a sso
olliid
d sstta
atte
e
sstta
arrtte
errss,, d
diisscco
on
nn
ne
ecctt p
po
ow
we
err tto
o u
un
niitt d
du
urriin
ng
g
e
ev
va
accu
ua
attiio
on
n o
orr w
wh
he
en
n tth
he
e u
un
niitt iiss iin
n a
a d
de
ee
ep
p
v
va
accu
uu
um
m.. IIn
n a
ad
dd
diittiio
on
n,, o
on
n u
un
niittss w
wiitth
h iin
nssiid
de
e--
tth
he
e--d
de
elltta
a sso
olliid
d sstta
atte
e sstta
arrtte
errss,, a
allll p
po
ow
we
err tto
o
tth
he
e u
un
niitt m
mu
usstt b
be
e d
diisscco
on
nn
ne
ecctte
ed
d p
prriio
orr tto
o
e
ev
va
accu
ua
attiin
ng
g tth
he
e u
un
niitt a
ass lliin
ne
e p
po
ow
we
err iiss d
diirre
eccttlly
y
a
ap
pp
plliie
ed
d tto
o tth
he
e m
mo
otto
orr tte
errm
miin
na
allss 4
4,, 5
5,, a
an
nd
d 6
6..
Check electrical and controls.
Inspect motor starter and control panel.
Confirm all wiring connections are tight, free
of abrasion and have no sharp bends in
panel and on compressors.
Inspect contactors and relays.
Verify unit wiring (low and high voltage) is
correctly isolated, phased, and properly
grounded.
Connect external 120 Vac power to power up
the control panel.
Run the oil pump to verify pump can provide
(20 to 24 psid)137.9 to 165.5 kPaD net
Summary of Contents for CVHH CenTraVac
Page 126: ...126 CVHH SVX001G EN N No ot te es s ...