14
CXRC-SVX01J-EN
Installation Preparation
Before installing the unit, perform the following
procedure to ensure proper unit operation.
1. Position the unit and skid assembly in its final
location.
2. Test lift the unit to determine exact unit balance and
stability before hoisting it to the installation
location. Refer to the section,
, for proper rigging procedures
and cautions.
3. Remove the skids from under the unit. Refer to the
section,
Skid Removal
in the Installation, Operation,
and Maintenance Manual, SCXF-SVX01. If internal
damage is found, file a claim immediately to the
delivering carrier.
4. Remove the protective shipping covers from the
unit.
5. Verify isolators are properly tightened for
operation. Refer to the section,
.
Unit Isolation
N
NO
OT
TIIC
CE
E
E
Eq
qu
uiip
pm
me
en
ntt D
Da
am
ma
ag
ge
e!!
P
Prro
op
pe
err iisso
olla
atto
orr cclle
ea
arra
an
ncce
e a
an
nd
d u
un
niitt lle
ev
ve
ell m
mu
usstt b
be
e
a
acch
hiie
ev
ve
ed
d o
orr ssttrru
uccttu
urra
all d
da
am
ma
ag
ge
e m
ma
ay
y o
occccu
urr..
The standard unit comes with 6”x 6”x 3/8” thick
isolator pads. Place these under the unit in the
locations shown in
through
.
Spring Isolators
Unit mounting locations are shown in
through
. Operating weights and weight
loading at each mounting location are provided in
. In addition, isolator placement
instructions are placed in the control panel with other
unit documentation. Isolators are identified by spring
color and by the isolator part number. All units utilize
CP-1-28 green isolators (20–32 ton units use 4 isolators
per unit, 35-40 ton units use 6, and 50–60 ton units use
8). Install spring isolators at each unit mounting point
using the following procedure:
1. Bolt the isolators to the mounting surface using the
mounting slots in the isolators base plate. Do not
fully tighten the isolators mounting bolts at this
time.
2. Set the unit on the isolators. The isolator
positioning pins must register in the unit mounting
holes. See
through
for locations.
3. Ensure clearances between upper and lower
isolator housings are between 1/4” to 1/2”. Refer to
the isolator detail in
. A clearance of
over 1/2” requires shims to level the unit. Refer to
the section,
.
4. Make minor clearance adjustments by turning the
isolator leveling bolt clockwise to increase
clearance and counterclockwise to decrease