background image

CXRC-SVX01J-EN

25

Maintenance

Read the following Warnings and Cautions before
beginning any maintenance procedures.

W

WA

AR

RN

NIIN

NG

G

H

Ha

azza

arrd

do

ou

uss S

Se

errv

viicce

e P

Prro

occe

ed

du

urre

ess!!

F

Fa

aiillu

urre

e tto

o ffo

ollllo

ow

w a

allll p

prre

ecca

au

uttiio

on

nss iin

n tth

hiiss m

ma

an

nu

ua

all a

an

nd

d

o

on

n tth

he

e tta

ag

gss,, ssttiicckke

errss,, a

an

nd

d lla

ab

be

ellss cco

ou

ulld

d rre

essu

ulltt iin

n

d

de

ea

atth

h o

orr sse

erriio

ou

uss iin

njju

urry

y..

T

Te

ecch

hn

niicciia

an

nss,, iin

n o

orrd

de

err tto

o p

prro

otte

ecctt tth

he

em

msse

ellv

ve

ess ffrro

om

m

p

po

otte

en

nttiia

all e

elle

eccttrriicca

all,, m

me

ecch

ha

an

niicca

all,, a

an

nd

d cch

he

em

miicca

all

h

ha

azza

arrd

dss,, M

MU

US

ST

T ffo

ollllo

ow

w p

prre

ecca

au

uttiio

on

nss iin

n tth

hiiss m

ma

an

nu

ua

all

a

an

nd

d o

on

n tth

he

e tta

ag

gss,, ssttiicckke

errss,, a

an

nd

d lla

ab

be

ellss,, a

ass w

we

ellll a

ass tth

he

e

ffo

ollllo

ow

wiin

ng

g iin

nssttrru

uccttiio

on

nss:: U

Un

nlle

essss ssp

pe

ecciiffiie

ed

d o

otth

he

errw

wiisse

e,,

d

diisscco

on

nn

ne

ecctt a

allll e

elle

eccttrriicca

all p

po

ow

we

err iin

nccllu

ud

diin

ng

g rre

em

mo

otte

e

d

diisscco

on

nn

ne

ecctt a

an

nd

d d

diisscch

ha

arrg

ge

e a

allll e

en

ne

errg

gy

y sstto

orriin

ng

g

d

de

ev

viicce

ess ssu

ucch

h a

ass cca

ap

pa

acciitto

orrss b

be

effo

orre

e sse

errv

viicciin

ng

g..

F

Fo

ollllo

ow

w p

prro

op

pe

err llo

occkko

ou

utt//tta

ag

go

ou

utt p

prro

occe

ed

du

urre

ess tto

o

e

en

nssu

urre

e tth

he

e p

po

ow

we

err cca

an

n n

no

ott b

be

e iin

na

ad

dv

ve

errtte

en

nttlly

y

e

en

ne

errg

giizze

ed

d.. W

Wh

he

en

n n

ne

ecce

essssa

arry

y tto

o w

wo

orrkk w

wiitth

h lliiv

ve

e

e

elle

eccttrriicca

all cco

om

mp

po

on

ne

en

nttss,, h

ha

av

ve

e a

a q

qu

ua

alliiffiie

ed

d lliicce

en

nsse

ed

d

e

elle

eccttrriicciia

an

n o

orr o

otth

he

err iin

nd

diiv

viid

du

ua

all w

wh

ho

o h

ha

ass b

be

ee

en

n

ttrra

aiin

ne

ed

d iin

n h

ha

an

nd

dlliin

ng

g lliiv

ve

e e

elle

eccttrriicca

all cco

om

mp

po

on

ne

en

nttss

p

pe

errffo

orrm

m tth

he

esse

e tta

asskkss..

Refrigerant System

Refrigerant Leak Test Procedure

W

WA

AR

RN

NIIN

NG

G

C

Co

on

nffiin

ne

ed

d S

Sp

pa

acce

e H

Ha

azza

arrd

dss!!

F

Fa

aiillu

urre

e tto

o ffo

ollllo

ow

w iin

nssttrru

uccttiio

on

nss b

be

ello

ow

w cco

ou

ulld

d rre

essu

ulltt iin

n

d

de

ea

atth

h o

orr sse

erriio

ou

uss iin

njju

urry

y..

D

Do

o n

no

ott w

wo

orrkk iin

n cco

on

nffiin

ne

ed

d ssp

pa

acce

ess w

wh

he

erre

e rre

effrriig

ge

erra

an

ntt

o

orr o

otth

he

err h

ha

azza

arrd

do

ou

uss,, tto

ox

xiicc o

orr fflla

am

mm

ma

ab

blle

e g

ga

ass m

ma

ay

y b

be

e

lle

ea

akkiin

ng

g.. R

Re

effrriig

ge

erra

an

ntt o

orr o

otth

he

err g

ga

asse

ess cco

ou

ulld

d d

diissp

plla

acce

e

a

av

va

aiilla

ab

blle

e o

ox

xy

yg

ge

en

n tto

o b

brre

ea

atth

he

e,, cca

au

ussiin

ng

g p

po

ossssiib

blle

e

a

assp

ph

hy

yx

xiia

attiio

on

n o

orr o

otth

he

err sse

erriio

ou

uss h

he

ea

alltth

h rriisskkss.. S

So

om

me

e

g

ga

asse

ess m

ma

ay

y b

be

e fflla

am

mm

ma

ab

blle

e a

an

nd

d o

orr e

ex

xp

pllo

ossiiv

ve

e.. IIff a

a lle

ea

akk

iin

n ssu

ucch

h ssp

pa

acce

ess iiss d

de

ette

ecctte

ed

d,, e

ev

va

accu

ua

atte

e tth

he

e a

arre

ea

a

iim

mm

me

ed

diia

atte

elly

y a

an

nd

d cco

on

ntta

acctt tth

he

e p

prro

op

pe

err rre

essccu

ue

e o

orr

rre

essp

po

on

nsse

e a

au

utth

ho

orriitty

y..

W

WA

AR

RN

NIIN

NG

G

E

Ex

xp

pllo

ossiio

on

n H

Ha

azza

arrd

d!!

F

Fa

aiillu

urre

e tto

o ffo

ollllo

ow

w ssa

affe

e lle

ea

akk tte

esstt p

prro

occe

ed

du

urre

ess b

be

ello

ow

w

cco

ou

ulld

d rre

essu

ulltt iin

n d

de

ea

atth

h o

orr sse

erriio

ou

uss iin

njju

urry

y o

orr

e

eq

qu

uiip

pm

me

en

ntt o

orr p

prro

op

pe

errtty

y--o

on

nlly

y--d

da

am

ma

ag

ge

e..

N

Ne

ev

ve

err u

usse

e a

an

n o

op

pe

en

n fflla

am

me

e tto

o d

de

ette

ecctt g

ga

ass lle

ea

akkss.. U

Usse

e a

a

lle

ea

akk tte

esstt sso

ollu

uttiio

on

n ffo

orr lle

ea

akk tte

essttiin

ng

g..

W

WA

AR

RN

NIIN

NG

G

E

Ex

xp

pllo

ossiio

on

n H

Ha

azza

arrd

d!!

F

Fa

aiillu

urre

e tto

o ffo

ollllo

ow

w tth

he

esse

e iin

nssttrru

uccttiio

on

nss cco

ou

ulld

d rre

essu

ulltt iin

n

d

de

ea

atth

h o

orr sse

erriio

ou

uss iin

njju

urry

y o

orr e

eq

qu

uiip

pm

me

en

ntt o

orr p

prro

op

pe

errtty

y--

o

on

nlly

y d

da

am

ma

ag

ge

e..

U

Usse

e o

on

nlly

y d

drry

y n

niittrro

og

ge

en

n w

wiitth

h a

a p

prre

essssu

urre

e rre

eg

gu

ulla

atto

orr ffo

orr

p

prre

essssu

urriizziin

ng

g u

un

niitt.. D

Do

o n

no

ott u

usse

e a

acce

etty

ylle

en

ne

e,, o

ox

xy

yg

ge

en

n o

orr

cco

om

mp

prre

esssse

ed

d a

aiirr o

orr m

miix

xttu

urre

ess cco

on

ntta

aiin

niin

ng

g tth

he

em

m ffo

orr

p

prre

essssu

urre

e tte

essttiin

ng

g.. D

Do

o n

no

ott u

usse

e m

miix

xttu

urre

ess o

off a

a

h

hy

yd

drro

og

ge

en

n cco

on

ntta

aiin

niin

ng

g rre

effrriig

ge

erra

an

ntt a

an

nd

d a

aiirr a

ab

bo

ov

ve

e

a

attm

mo

ossp

ph

he

erriicc p

prre

essssu

urre

e ffo

orr p

prre

essssu

urre

e tte

essttiin

ng

g a

ass tth

he

ey

y

m

ma

ay

y b

be

ecco

om

me

e fflla

am

mm

ma

ab

blle

e a

an

nd

d cco

ou

ulld

d rre

essu

ulltt iin

n a

an

n

e

ex

xp

pllo

ossiio

on

n.. R

Re

effrriig

ge

erra

an

ntt,, w

wh

he

en

n u

usse

ed

d a

ass a

a ttrra

acce

e g

ga

ass

ssh

ho

ou

ulld

d o

on

nlly

y b

be

e m

miix

xe

ed

d w

wiitth

h d

drry

y n

niittrro

og

ge

en

n ffo

orr

p

prre

essssu

urriizziin

ng

g u

un

niittss..

W

WA

AR

RN

NIIN

NG

G

E

Ex

xp

pllo

ossiio

on

n H

Ha

azza

arrd

d!!

F

Fa

aiillu

urre

e tto

o ffo

ollllo

ow

w iin

nssttrru

uccttiio

on

n b

be

ello

ow

w cco

ou

ulld

d rre

essu

ulltt iin

n

d

de

ea

atth

h o

orr sse

erriio

ou

uss iin

njju

urry

y..

D

Do

o n

no

ott e

ex

xcce

ee

ed

d u

un

niitt n

na

am

me

ep

plla

atte

e d

de

essiig

gn

n p

prre

essssu

urre

ess

w

wh

he

en

n lle

ea

akk tte

essttiin

ng

g ssy

ysstte

em

m..

W

WA

AR

RN

NIIN

NG

G

R

R--4

41

10

0A

A R

Re

effrriig

ge

erra

an

ntt u

un

nd

de

err H

Hiig

gh

he

err

P

Prre

essssu

urre

e tth

ha

an

n R

R--2

22

2!!

F

Fa

aiillu

urre

e tto

o u

usse

e p

prro

op

pe

err e

eq

qu

uiip

pm

me

en

ntt o

orr cco

om

mp

po

on

ne

en

nttss a

ass

d

de

essccrriib

be

ed

d b

be

ello

ow

w,, cco

ou

ulld

d rre

essu

ulltt iin

n e

eq

qu

uiip

pm

me

en

ntt ffa

aiilliin

ng

g

a

an

nd

d p

po

ossssiib

blly

y e

ex

xp

pllo

od

diin

ng

g,, w

wh

hiicch

h cco

ou

ulld

d rre

essu

ulltt iin

n

d

de

ea

atth

h,, sse

erriio

ou

uss iin

njju

urry

y,, o

orr e

eq

qu

uiip

pm

me

en

ntt d

da

am

ma

ag

ge

e..

T

Th

he

e u

un

niittss d

de

essccrriib

be

ed

d iin

n tth

hiiss m

ma

an

nu

ua

all u

usse

e R

R--4

41

10

0A

A

rre

effrriig

ge

erra

an

ntt w

wh

hiicch

h o

op

pe

erra

atte

ess a

att h

hiig

gh

he

err p

prre

essssu

urre

ess

tth

ha

an

n R

R--2

22

2.. U

Usse

e O

ON

NL

LY

Y R

R--4

41

10

0A

A rra

atte

ed

d sse

errv

viicce

e

e

eq

qu

uiip

pm

me

en

ntt o

orr cco

om

mp

po

on

ne

en

nttss w

wiitth

h tth

he

esse

e u

un

niittss.. F

Fo

orr

ssp

pe

ecciiffiicc h

ha

an

nd

dlliin

ng

g cco

on

ncce

errn

nss w

wiitth

h R

R--4

41

10

0A

A,, p

plle

ea

asse

e

cco

on

ntta

acctt y

yo

ou

urr llo

occa

all T

Trra

an

ne

e rre

ep

prre

esse

en

ntta

attiiv

ve

e..

N

No

otte

e:: These service procedures require working with

refrigerant. Do not release refrigerant to the
atmosphere. The service technician must comply
with all federal, state, and local laws.

IIm

mp

po

orrtta

an

ntt:: When Leak-testing refrigerant systems,

observe all safety precautions. Leak test
only one circuit at a time to minimize
system exposure to potentially harmful
moisture in the air. Use R-410A refrigerant
gas as a tracer for leak detection and use
oil-pumped dry nitrogen to develop
required test pressures.

Summary of Contents for CCRC 20

Page 1: ...e and training Improperly installed adjusted or altered equipment by an unqualified person could result in death or serious injury When working on the equipment observe all precautions in the literatu...

Page 2: ...a ar r p pr ro op pe er r P PP PE E f fo or r t th he e j jo ob b b be ei in ng g u un nd de er rt ta ak ke en n c co ou ul ld d r re es su ul lt t i in n d de ea at th h o or r s se er ri io ou us s...

Page 3: ...d de ea at th h o or r s se er ri io ou us s i in nj ju ur ry y D Di is sc co on nn ne ec ct t a al ll l e el le ec ct tr ri ic c p po ow we er r i in nc cl lu ud di in ng g r re em mo ot te e d di i...

Page 4: ...endations 19 Power Supply Wiring 19 System Interconnection Wiring 19 Unit Wiring Diagrams 19 Unit Voltage 19 Voltage Supply 19 Voltage Imbalance 20 Operating Principles 21 Control Sequences of Operati...

Page 5: ...minimized It is important that periodic maintenance be performed to help assure trouble free operation A maintenance schedule is provided at the end of this manual Should equipment failure occur cont...

Page 6: ...it 8 Unit Voltage 4 460 Volt 60 Hz 3 ph 5 575 Volt 60 Hz 3 ph 6 200 Volt 60 Hz 3 ph Digit 9 Control Option 0 No Low Ambient IPak A No Low Ambient T Stat B Low Ambient IPak C Low Ambient T Stat Note T...

Page 7: ...ouvered condenser grills are for coil protection and available as an option to order Direct drive vertical discharge fans are provided with built in current and overload protection Head pressure contr...

Page 8: ...e floor or foundation is level solid and sufficient to support the unit and accessory weights Level or repair the floor before positioning the unit if necessary N No ot te e For a detailed discussion...

Page 9: ...amper per Circuit Refrigerant Line Connections Frontal View AC AB AA Table 1 CCRC CIRC Unit Weights Unit Size Shipping Weight lbs kg Operating Weight lbs kg CCRC CIRC 20 2030 920 1906 865 CCRC CIRC 29...

Page 10: ...R 3 4 CONDUIT SUPPLY VOLTAGE WIRE ENTRY HOLE SIZED FOR 1 CONDUIT 66 7 8 1699mm 18 1 4 1 2 114mm 1 2 470mm Hot Gas Conn Refrig ckt 17 1 2 445mm 14 3 8 365mm Liq Line Conn Refrig ckt 1 24 3 4 629mm Liq...

Page 11: ...ances are doubled See for specific pit installation clearance instructions If multiple units are placed side by side the minimum distance between units must be twice the normal recommended side cleara...

Page 12: ...e 9 Recommended Clearances for Typical Pit Installation for All Unit Sizes Figure 10 Typical Side by Side Installation Recommended Clearances for All Unit Sizes D Di im me en ns si io on ns s a an nd...

Page 13: ...ty y l li if ft t p po oi in nt t T To o a av vo oi id d d dr ro op pp pi in ng g o of f u un ni it t r re ep po os si it ti io on n l li if ft ti in ng g p po oi in nt t i if f u un ni it t i is s n...

Page 14: ...shown in Figure 13 p 15 through Figure 15 p 16 Spring Isolators Unit mounting locations are shown in Figure 13 p 15 through Figure 15 p 16 Operating weights and weight loading at each mounting locati...

Page 15: ...lb 20 2030 463 463 463 517 1906 29 2084 490 463 490 517 1960 32 2138 490 490 490 554 2014 35 3018 463 463 463 463 463 518 2833 40 3072 463 463 490 463 463 518 2887 50 3995 490 490 490 490 490 350 490...

Page 16: ...near the condenser to facilitate refrigerant storage in the condenser during service procedures When optional discharge line ball valves are present in the indoor section installation of field suppli...

Page 17: ...of the indoor unit left side for SCRF SIRF right side for SCRG SIRG CCRC CIRC connections are located in the unit front at the top Remove cap with a tube cutter to minimize risk of getting chips insi...

Page 18: ...SXRG CXRC Size Circuit 1 Circuit 2 Liquid Discharge Liquid Discharge 20 20 5 8 in 7 8 in 5 8 in 7 8 in 25 29 5 8 in 1 1 8 in 5 8 in 7 8 in 32 32 5 8 in 1 1 8 in 5 8 in 1 1 8 in a Use 1 1 8 for vertica...

Page 19: ...ided in this manual Power Supply Wiring Run appropriately sized power wiring and field supplied conduit through the line voltage access opening provided on the front of the unit Refer to Figure 1 p 7...

Page 20: ...measured 227 V 221 230 227 3 2 2 N No ot te e L1 221 volts is the maximum deviation of the 3 voltages from the average of the 3 voltages Therefore the imbalance percentage is 100 226 221 226 2 2 The...

Page 21: ...ow If saturated condenser temperature continues to rise with damper modulated fully open K1 relay drops out and the IntelliPak controller pulls in K2 relay subsequently pulling in contactor Circuit 1B...

Page 22: ...operation on all units is interlocked with compressor start and stop They use customer provided compressor contactor auxiliary contacts and liquid line pressure if the thermostat controlled unit is u...

Page 23: ...he fan orifices and should be mounted securely on the motor shafts Check condenser coils Coil fins should be clean and straight There should be no restrictions to proper airflow through the condenser...

Page 24: ...n n t th he e c cr ra an nk kc ca as se e h he ea at te er rs s o on n f fo or r a a m mi in ni im mu um m o of f 2 24 4 h ho ou ur rs s b be ef fo or re e s st ta ar rt ti in ng g c co om mp pr re es...

Page 25: ...i io ou us s i in nj ju ur ry y o or r e eq qu ui ip pm me en nt t o or r p pr ro op pe er rt ty y o on nl ly y d da am ma ag ge e N Ne ev ve er r u us se e a an n o op pe en n f fl la am me e t to o...

Page 26: ...l check the oil container for discoloration which usually indicates moisture in the oil and or water droplets Moisture in the oil adds to what must be removed from the system increasing pump down time...

Page 27: ...ls off to a constant value this indicates that there is excessive moisture present If the pressure steadily continues to rise a leak is indicated Figure 18 p 27 illustrates three possible results of t...

Page 28: ...frigerant charging can begin Charge refrigerant into the system by weight Approximate operating refrigerant charge capacities for 20 through 60 ton CCRC CIRC condensing units are given in and Calculat...

Page 29: ...with fin comb as required 5 Mix the detergent with water according to the manufacturers instructions N No ot te e Observe all recommendations of the cleanser manufacturer The coil cleanser manufactur...

Page 30: ...en ns se ed d e el le ec ct tr ri ic ci ia an n o or r o ot th he er r i in nd di iv vi id du ua al l w wh ho o h ha as s b be ee en n p pr ro op pe er rl ly y t tr ra ai in ne ed d i in n h ha an nd...

Page 31: ...Power and Controls 20 60T IntelliPak 2313 1632 Schematic Power and Controls 20 32T Thermostat Controls 2313 1635 Connections Control Panel w Thermostat Controls 2313 1636 Connections Control Panel w v...

Page 32: ...or more information please visit trane com or tranetechnologies com Trane has a policy of continuous product and product data improvements and reserves the right to change design and specifications wi...

Reviews: