Since coil/ enclosure assembly must be installed within 

the horizontal run of duct, a transition duct must be 

fabricated to mate with the furnace supply outlet duct 

flange on one end and the duct flange connection on the 

coil/ enclosure assembly on the other end.
For maximum performance, it is recommended that the 

transition duct be at least 2 feet in length.

1.  Secure the transition duct to the furnace with the 

furnace in position.

2.  The refrigerant lines and condensate connections of 

cased coils may be on either side of the supply air 

duct. The air may be directed through the coil from 

either side of the coil.

3.  Attach the coil/ enclosure assembly to the transition 

from the furnace, providing proper support for coil/ 

enclosure assembly’s weight. Keep the coil level. 

Extra pitch is not required for coil to drain properly. 

4.  Secure the downstream side of coil/ enclosure 

assembly to the supply air duct.

NOTE: 
Secure properly so there will be no air leakage.

5.  When hanging the coil for ceiling mounted 

applications, do not assemble screws in the cabinet 

in areas that may puncture the coil or drainpan. Areas 

to be avoided include the back, bottom, front, top 

center, and lower 3" of the left and right sides of the 

coil cabinet.

6.  The indoor coil must be evacuated through the 

refrigerant lines at the outdoor unit before opening 

the service valves. See evacuation procedure in 

Field Fabricated Refrigerant Lines section of the 

Installer’s Guide for the outdoor unit.

7.  Complete the installation of the unit per installation 

instructions.

FLUE 

STACK

TRANSITION DUCT

COIL/ENCLOSURE ASSY

SUPPLY DUCT

VERTICAL UPFLOW

FURNACE

E. INSTALLING/BRAZING REFRIGERANT 

LINES 

CAUTION

!

Do NOT open refrigerant valve at the outdoor 
unit until the refrigerant lines and coil have been 
brazed, evacuated, and leak checked. This would 
cause contamination of the refrigerant or possible 
discharge of refrigerant to the atmosphere.

1.  The following steps are to be considered when 

installing the refrigerant lines:

a. Determine the most practical way to run the lines.

b. Consider  types  of  bends  to  be  made  and  space                                                                                                                                    

limitations.

c. Route the tubing making all required bends and 

properly secure the tubing before making final 

connections.

NOTE: 
Refrigerant lines must be isolated from the structure 
and the holes must be sealed weather tight after 
installation.

IMPORTANT:  
Do not unseal refrigerant tubing until ready to fit 
refrigerant lines.

Summary of Contents for 4PXFH001BC3HHA

Page 1: ...checked against selected installation site By noting in advance proper clearance allowances for installation and possible future service of the coil ALL phases of this installation must comply with NATIONAL STATE AND LOCAL CODES IMPORTANT This Document is customer property and is to remain with this unit Please return to service information pack upon completion of work 18 AD40D1 1B EN WARNING This...

Page 2: ... B A 5 00 6 50 0 75 FLANGES TYP 6 81 1 75 SUCTION TUBE SEE TABLE FOR SIZES 3 8 LIQUID LINE D OPENING C E 3 00 MAX TRANE MODEL A B C D E SUCTION SIZE 4PXFH003BZ3HHA 10 23 50 21 30 35 50 3 4 4PXFH001BC3HHA 10 23 50 21 24 29 50 3 4 4PXFH005BZ3HHA 10 23 50 21 30 35 50 3 4 4PXFH004BC3HHA 10 23 50 21 30 35 50 7 8 4PXFH007BC3HHA 10 23 50 21 30 35 50 7 8 4PXFH009BZ3HHA 10 29 50 27 34 41 50 7 8 ISOMETRIC V...

Page 3: ...e coil or drainpan Areas to be avoided include the back bottom front top center and lower 3 of the left and right sides of the coil cabinet 6 The indoor coil must be evacuated through the refrigerant lines at the outdoor unit before opening the service valves See evacuation procedure in Field Fabricated Refrigerant Lines section of the Installer s Guide for the outdoor unit 7 Complete the installa...

Page 4: ... assembly The female threaded fitting protrudes outside of the enclosure for external connection A field fabricated trap is not required for proper drainage due to the positive pressure of the furnace however it is recommended to prevent efficiency loss of conditioned air 1 The drain hole in the drain pan must be cleared of all insulation 2 Insulate the primary drain line to prevent sweating where...

Page 5: ...oth section of suction vapor line using the metal clamp provided In order to obtain a good temperature reading and correct superheat control the TXV sensing bulb must conform to the following criteria 1 The sensing bulb must be in direct and continuous contact with the suction line 2 The sensing bulb should be mounted horizontally on the suction line 3 The sensing bulb should be mounted at the 2 o...

Page 6: ...perature more than 85F NO Is sub cooling less than 8F YES Confirm that charge is correct and look for dirty or restricted outdoor coil Confirm that charge is correct NO Before starting insure the blower wheel indoor and outdoor coils are clean Is the liquid line temperature at indoor coil within 8F of outdoor liquid line temperature YES Verify line set is sized properly for application NO The syst...

Page 7: ...18 AD40D1 1B EN 7 Installer s Guide Wrap TXV with wet cloth before brazing Direct torch away from wrapped valve ...

Page 8: ...lications For more information please visit www trane com or www americanstandardair com The manufacturer has a policy of continuous data improvement and it reserves the right to change design and specifications without notice We are committed to using environmentally conscious print practices 2022 18 AD40D1 1B EN 24 Jan 2022 Supersedes 18 AD40D1 1A EN December 2020 ...

Reviews: