![Trailer Valet RVR12 Operating Manual Download Page 11](http://html1.mh-extra.com/html/trailer-valet/rvr12/rvr12_operating-manual_1148394011.webp)
11
TREAD MAINTENANCE
3. Overlap the Track Links on each side of the track and insert the track pin and
rotoclip as shown below.
4. Inspect the track pin and Rotoclips. The Rotoclips should rotate freely inside the
pin groove.
5. There should be about a 1/2” of play at the center of the track.
6. Reinstall the plastic track covers.
7. Repeat steps for the other track if needed.
Apply pressure on end
of pin when inserting the
clip on the other end
Track Pin and
Rotoclip
New Rotoclip
Retainer
Clip Tool
Install Plastic
Track Cover
Insert Rotoclip into Retainer Clip Tool
(Teeth pointing towards clip tool)
Retainer Clip Tool
Track Pin
Summary of Contents for RVR12
Page 1: ...OPERATING MANUAL RVR12...