CHECK BEFORE OPERATION
Air Supply
DANGER
Follow Lock-out / Tag-out (LOTO) procedures for all process and energy connections.
WARNING
All air supply system components must be rated for the service conditions present.
Step Check Description
1
Air supply is capable of supplying adequate air volume (at least 90cfm per unit)
2
Air supply is capable of supplying adequate air pressure (at least 100 psig)
3
Air supply is connected to ZEVAC in a secure fashion
4
Air supply connection piping / hoses have been verified to be leak-free
5
Air regulator is set to deliver adequate pressure to ZEVAC (100
–
250 psi)
6
VERIFY Hose halters are in place on all hose connections
Inlet Connection
DANGER
Follow Lock-out / Tag-out (LOTO) procedures for all process and energy connections.
WARNING
All gas system components must be rated for the service conditions present.
Step Check Description
1
Identify inlet gas connection
2
Verify inlet gas connection has isolation valve
3
Inlet Gas Connection is connected to ZEVAC in a secure fashion
4
Inlet Gas piping / hoses have been verified to be leak-free
5
Inlet Gas piping has an isolation valve
6
Verify hose halters are in place on ZEVAC inlet gas hose.
Discharge Connection
DANGER
Follow Lock-out / Tag-out (LOTO) procedures for all process and energy connections.
WARNING
All gas system components must be rated for the service conditions present.
Step Check Description
1
Identify discharge gas connection