![TPC PC2800 Operation Manual Download Page 7](http://html1.mh-extra.com/html/tpc/pc2800/pc2800_operation-manual_1146122007.webp)
environment.
Note
:
UT refers to the AC grid voltage before applying the test voltage
.
3: Product Structure and Installation
3.1
Structure diagram:
3.2
Installation procedure:
3.2.1
Open-package Inspection
Open the package, and check whether the device is in good condition, check complement of unit, spare
parts and consumable parts according to the packing list. If you have any questions, please contact our
distributor or our company directly.
3.2.2
Installation
1)
Move the machine to appropriate location on the flat solid floor and press on the brake at the bottom
of wheel.
2)
Install the free arm onto the mounting joint at the top of the box.
3)
Install the suction cover onto designated spot as above picture shows.
4)
Use one-phase AC 220V-50hz or other local power (220V 60hz, 240V 50hz, 110V 60hz) would be ok.
3.3
Operation mode control
Move the machine to appropriate location and press on the brake at the bottom of wheel, plug in the power
cord, pull the free arm to an appropriate position according to the demand, switch on the power and device
start to work. Suction power could be controlled through the knob on the control panel, turn off the power
switch after use, pull back the free arm.
This equipment has stepless knob, it can meet the needs for most operation when the knob is adjusted to the
low power area (green area). If some surgery need larger flow, it can be adjusted clockwise, the maximum
power is not recommended.