09
Gigabit Uplink Web Smart Switch
1
3
5
7
2
4
6
8
GIGA
SFP
10/100Mbps
10/100/1000Mbps
1000Mbps
1
2
3
4
5
6
7
8
TL-SL2210WEB
RESET
8+2G Web-Sm
art Switch
Power
100M
Link
Act
System
1000M
GIGA
Link/Act
Link/Act
R
Rack-mounting Bracket
Screw
Bracket Installation
Figure 2-2
After the brackets are attached to the device, use suitable screws (not provided1 to
3.
secure the brackets to the rack, as illustrated in the following figure.
1
3
5
7
2
4
6
8
GIGA
SFP
10/100Mbps
10/100/1000Mbps
1000Mbps
1
2
3
4
5
6
7
8
TL-SL2210WEB
RESET
8+2G Web-Sm
art Switch
Power
100M
Link
Act
System
1000M
GIGA
Link/Act
Link/Act
R
Rack
Rack Installation
Figure 2-3
Caution:
Please set 5~10cm gaps around the device for air circulation.
■
Please avoid any heavy thing placed on the device.
■
Please mount devices in sequence from the bottom to top of the rack and ensure a
■
certain clearance between devices for the purpose of heat dissipation.
Installation
Summary of Contents for TL-SL2210WEB
Page 2: ......
Page 63: ......
Page 64: ...Website http www tp link com E mail support tp link com 7106503690 Rev 2 0 0...