background image

6

Unmanaged PoE+ Switch

Installation

Chapter 2  Installation

2.1  Package Contents

Make sure that the package contains the following items. If any of the listed items is damaged or 

missing, contact your distributor.

 

One Power Cord

One Switch

This Installation Guide

Installation Guide

Business Networking Solution

Two mounting brackets, eight 

screws and four rubber feet

2.2  Safety Precautions

To avoid any device damage and bodily injury caused by improper use, you should observe the 

following rules.

 

Safety Precautions

 

Keep the power off during the installation.

 

Wear an ESD-preventive wrist strap, and make sure that the wrist strap has a good skin contact and is 

well grounded.

 

Use only the power cord provided with the switch.

 

Make sure that the supply voltage matches the specifications indicated on the rear panel of the 

switch.

 

Ensure that the switch is installed in a well-ventilated environment and its ventilation hole is not 

blocked.

 

Do not open or remove the cover of the switch.

 

Before cleaning the device, cut off the power supply. Do not clean it by the waterish cloth, and never 

use any other liquid cleaning method.

 

Place the device with its bottom surface downward.

 

Site Requirements

Temperature/Humidity

40°C

0°C

Summary of Contents for TL-SL1218MP

Page 1: ...Business Networking Solution Installation Guide Unmanaged PoE Switch...

Page 2: ......

Page 3: ...rts in Extend Mode will downgrade to 10 Mbps The actual transmission distance may vary due to power consumption of PoE powered devices or the cable quality and type PoE budget calculations are based o...

Page 4: ...tion 6 2 1 Package Contents 6 2 2 Safety Precautions 6 2 3 Installation Tools 8 2 4 Product Installation 8 Chapter 3 Connection 10 3 1 Ethernet Port 10 3 2 SFP Port 10 3 3 Verify Installation 10 3 4 P...

Page 5: ...er along with data to remote devices over standard twisted pair cable in an Ethernet network PD is a device powered by a PSE and thus consumes energy Examples include powering IP telephones wireless L...

Page 6: ...s of the port PoE Max For TL SL1218P On Total power supply 143 W Flashing Total power supply 143 W and lasts for more than 2 minutes Off Total power supply 143 W For TL SL1218MP On Total power supply...

Page 7: ...nt panel of TL SL1226P is shown as the following figure Figure 1 3 Front Panel of TL SL1226P 10 100 Mbps RJ45 Port Port 1 24 LEDs Switches 10 100 1000 Mbps RJ45 Port Port 25 26 SFP Port Port 25F 26F L...

Page 8: ...24 can transmit data with every port On Port 1 24 cannot transmit data with each other They can transmit data only with port 25 26 10 100 Mbps RJ45 Port Port 1 24 The ports are designed to connect to...

Page 9: ...oltage 100 240 V 50 60 Hz Caution You should use the provided power cord Grounding Terminal The switch already comes with lightning protection mechanism You can also ground the switch through the PE P...

Page 10: ...utions Keep the power off during the installation Wear an ESD preventive wrist strap and make sure that the wrist strap has a good skin contact and is well grounded Use only the power cord provided wi...

Page 11: ...ectricity on the operation of the switch please attach much importance to the following items Dust the device regularly and keep the indoor air clean Keep the device well grounded and ensure static el...

Page 12: ...he rack or workbench is flat stable and sturdy enough to support the weight of 5 5 kg at least The rack or workbench has a good ventilation system The equipment room is well ventilated The rack is wel...

Page 13: ...e with supplied screws as illustrated in the following figure Figure 2 2 Bracket Installation Rack mounting Bracket Screw 3 After the brackets are attached to the device use suitable screws not provid...

Page 14: ...n of SFP port to an SFP module Figure 3 2 Inserting the SFP Module SFP Slot SFP Module 3 3 Verify Installation After completing the installation please verify the following items There should be 5 to...

Page 15: ...5 Initialization After the device is powered on it begins the Power On Self Test A series of tests run automatically to ensure the device functions properly During this time its LED indicators will r...

Page 16: ...le connectors are firmly plugged into the switch and the device A2 Make sure the connected device is turned on and working well A3 The cable length should be less than 100 meters 328 feet If Extend Mo...

Page 17: ...For TL SL1218MP 16 10 100 Mbps RJ45 Ports Auto Negotiation Auto MDI MDIX 2 10 100 1000 Mbps RJ45 Ports Auto Negotiation Auto MDI MDIX 2 1000 Mbps SFP Slots Combo PoE Port RJ45 For TL SL1218P PoE Port...

Page 18: ...1 65 EU and EU 2015 863 The original EU declaration of conformity may be found at https www tp link com en ce Safety Information Keep the device away from water fire humidity or hot environments Do no...

Page 19: ......

Page 20: ...ineers please visit https community tp link com to join TP Link Community For technical support the user guide and other information please visit https www tp link com support or simply scan the QR co...

Reviews: