![Toyotomi CCT 100HINVi Service Manual Download Page 30](http://html1.mh-extra.com/html/toyotomi/cct-100hinvi/cct-100hinvi_service-manual_1143300030.webp)
Test operation
Installation
93
11. Test operation
11.1 The test operation must be carried out after the entire installation has been
completed.
11.2 Please confirm the following points before the test operation.
¾
The indoor unit and outdoor unit are installed properly.
¾
Tubing and wiring are correctly completed.
¾
The refrigerant pipe system is leakage-checked.
¾
The drainage is unimpeded.
¾
The ground wiring is connected correctly.
¾
The length of the tubing and the added stow capacity of the refrigerant have been recorded.
¾
The power voltage fits the rated voltage of the air conditioner.
¾
There is no obstacle at the outlet and inlet of the outdoor and indoor units.
¾
The gas-side and liquid-side stop values are both opened.
¾
The air conditioner is pre-heated by turning on the power.
11.3 Test operation
Set the air conditioner under the mode of "COOLING" by remote controller, and check the following points.
Indoor unit
¾
Whether the switch on the remote controller works well.
¾
Whether the buttons on the remote controller works well.
¾
Whether the air flow louver moves normally.
¾
Whether the room temperature is adjusted well.
¾
Whether the indicator lights normally.
¾
Whether the temporary buttons works well.
¾
Whether the drainage is normal.
¾
Whether there is vibration or abnormal noise during operation.
Outdoor unit
¾
Whether there is vibration or abnormal noise during operation.
¾
Whether the generated wind, noise, or condensed of by the air conditioner have influenced your
neighborhood.
¾
Whether any of the refrigerant is leaked.
Summary of Contents for CCT 100HINVi
Page 1: ...Service Manual MODEL CCT 50HINVi o CCT 70HINVi o CCT 100HINVi o...
Page 7: ...Indoor Units 6 Indoor Units Part 2 Indoor Units Super Slim Cassette Type 7...
Page 13: ...Dimensions 12 Indoor Units 2 Dimensions Model A H 18 205 235 24 205 235 36 245 275...
Page 14: ...Service Space Indoor Units 13 3 Service Space 1000mm 1000mm 1000mm 1000m m...
Page 15: ...Wiring Diagrams 14 Indoor Units 4 Wiring Diagrams CCT 50HINVi CCT 70HINVi CCT 100HINVi...
Page 20: ...Field Wiring Indoor Units 19 9 Field Wiring...
Page 25: ...Wiring Diagrams Outdoor Units 57 4 Wiring Diagrams CCT 50HINVo CCT 70HINVo...
Page 26: ...Wiring Diagrams 58 Outdoor Units CCT 100HINVo...
Page 45: ...Troubleshooting 108 Electrical Control System 2 4 1 2 Outdoor unit malfunction...
Page 50: ...Troubleshooting Electrical Control System 113 2 4 2 3 Up down panel is not closed...
Page 54: ...Troubleshooting Electrical Control System 117 2 4 4 3 E3 malfunction...
Page 55: ...Troubleshooting 118 Electrical Control System 2 4 4 4 E4 malfunction...
Page 60: ...Troubleshooting Electrical Control System 123 2 4 4 9 P1 malfunction For 36k models...
Page 61: ...Troubleshooting 124 Electrical Control System 2 4 4 10 P2 malfunction For 36k models...
Page 62: ...Troubleshooting Electrical Control System 125 2 4 4 11 P3 malfunction...