62
4. INSTALL GROUND CONNECTION.
(a) Remove the original ground bolt.
(b) Install the ground point onto the bolt.
(c) Install the ground bolt.
Torque: 9 Nm
5. CONNECT WIRING HARNESS.
(a) Disconnect the 3 connectors of the engine ECU.
(b) Connect the turbo charger control unit harness to the
engine ECU.
(c) Connect the 3 engine ECU connectors to the turbo
charger control system harness.
(d) Connect the grey connector of the interior harness to
the engine room harness.
(e) Connect the vacuum hose to the control unit.
Summary of Contents for 1ZZ-FTE
Page 2: ...2 ...
Page 11: ...11 1 3 EXHAUST MANIFOLD 4 2 4 1 4 3 4 3 3 7 9 3 9 3 9 3 9 3 9 3 9 2 9 1 4 1 4 1 ...
Page 14: ...14 1 6 OIL FILTER 13 2 13 3 13 3 13 1 13 4 13 4 26 7 15 2 15 3 15 3 15 1 13 1 ...
Page 19: ...19 1 11 HEAT INSULATION STICKERS AND SPARKPLUGS 26 1 11 1 26 2 11 2 11 2 11 2 11 2 ...
Page 28: ...28 2 Parts to be removed see workshop manual for detailed instructions U ...
Page 29: ...29 U U CONTINUED ...
Page 63: ...63 18 Parts to be installed see workshop manual for detailed instructions K 20 4 ...
Page 64: ...64 CONTINUED ...