62
4. Outdoor coil temperature is equal or lower than 8
℃
.
Note: forcible defrosting action and ending condition is the same as normal defrosting, but defrosting interval will be 50
minutes.
2) Power on/off function on outdoor controller:
SW1
:
clear inspection data memorizer (button)
SW2
:
output state indication and inspection data display switch (button)
SW3
:
output state item display switch (switch)
3) Time shorten:
Short circuit CN21 can shorten the time as below: (s = second, m = minute)
1. fan control cycle: 30s
→
3s;
2. 3minute delay: 3m
→
3s;
4.
defrosting maximum time:15m
→
15s;
5. defrosting
interval:
30m
→
120m
→
3s
→
12s;
6.
compressor that control distribute on/off: Xm
→
Xs;
7.
brace axis heater runs: 60m
→
6s
4) Plug function control:
plug name
function
without short circuit board
with short circuit board
J1
Reversal current inspection
not inspection
Inspection
J2
side way valve control
distributary valve defrosting switch
open when distributary valve defrost
J3
brace axis heat
continue heating
1-hour-off 1-hour-on
J4
cooling/heat choose
cooling & heat
cooling
5) service data display:
Through setting SW2 and SW3, lighting tube can display the output state and inspection code, output state will show
through lighting tube, inspection code will show through flash.
SW1: turn SW1 to ON, clear inspection code, if this happen in inspecting code period, signal will change to output state
indication.
Note: ordinary, SW1 works, independent with SW3, but in reset period, if inspection show reversal phase, SW1 don't work.
SW2
:
(
SW2 pressed ON released OFF
)
If SW3-1 and SW3-2 are OFF, press SW2 the indicating data will switch between inspection code and output state, if
SW-1 is OFF while SW-2 is ON, press SW2 forcible defrosting occur.