5056.42905D
6
TC30_ng05D 270315-16
Gas plumbing and vent connections
should be completed before proceeding.
The logs are fragile, and should be handled
with care. Unpack and inspect log set. There
should be a total of seven logs.
Position the logs as indicated by the following
pictures. The seven main logs have holes and /
or pins. Engage each pin in the corresponding
holes. The remaining two logs do not have
holes or pins. They rest in position. Locate
as per the diagrams (fig. # 7-15)
Note: Improper placement of logs
will cause sooting on internal parts
and glass. The logs may need to be
repositioned slightly to avoid excessive
flame impingement.
Log Placement
Fig. # 7
Fig. # 8
BASE LOG, #1
LEFT CENTER LOG, #2