7. With a 7/16” wrench loosen the pilot head
on the pilot assembly by a half-turn
(Fig. #19)
Fig. #21
Fig. # 19
Fig. # 20
8. Slide the pilot adjustment band
over and ensure that the hole in
the orifice band is showing. (Fig.
#20 shows NG position,
Fig. # 21 shows LP position)
For complete valve installation instructions, refer to the
instruction book included in the SIT conversion kit.
NG Position (Fig#20)
LP Position (Fig #21)
ADD NAME
ADD DATE
5056.42905D
TC30_ng05D 270315-16
11
Minimum
rate screw
HOLE
9. Fill in the date and the name of the
person who performed the conversion in
the white area on the conversion label.
Peel off the protective backing and apply
the conversion label directly over the
gas specifications on the rating label.