background image

tousek

  /  E_PASS-838_02  /  22. 10. 2018 

- 5 -

100

800

100

100

FB

F

S

T

•  Lead the insulating sleeves 

(S)

 for power supply and acces-

sories into the opening of the base plate. 

•  Embed the base plate firmly and horizontally in the founda

-

tion 

(F)

 

(see  „examples - Barrier installations“ page 13).

•  Set the operator housing on the base plate with the door 

(T)

 aligned to the road 

(FB)

 and secure it with the bolts. 

Therefore it has to be ensured that the connecting cables 

won’t be damaged.

3.  Installation  

Barrier PASS 838

housing backside

3b.  Mounting the barrier boom 

Installation

 Important

•  The barrier boom can be installed either on the left 

or on the right side of the operator housing.

•  Please do not load additional weight (e.g. sign boards) 

on the barrier boom. This could result in the damage 

of the gearbox unit.

left barrier 

right barrier

FB

T

T

•  In a first step knock in a metall key 

(K)

 into the nut of the gearing drive shaft on the side of the barrier where you wish to 

mount the boom. 

•  The following  mounting steps differ in accordance of whether you wish to  mount the round or the flat barrier boom.

 

Important - 

grease the drive shaft

•  put some grease onto the external drive shaft with 

provided grease!

 

(see picture))

 Foundation

•  The foundations to be made must be at least 

100mm 

larger around then the foundation plates concerned.  

•  The foundation must be raised from the ground level to 

a minimum of 

100mm.

  

•  The foundation depth from ground level to should have 

a minimum of 800mm

 (frost resistant).

•  The foundation always has to be adjusted to the structure 

of the ground.

 

It should consist of concrete quality C20/25 at ground 

class 3. The foundation has to be horizontal and free 

of cracks.

•  When using a support fork/tip rest pay attention to the 

offset 

V,

 which depends on the barrier used (barrier 

boom):

 

For barriers with flat boom: 

V = 190

 

For barrier type PASS 838 L6  

(= barrier with round boom): 

V = 220

K

K

3a.  Mounting of base plate and barrier operator 

Installation

= barrier width - 25mm

290 180

180

255

290

100

100

base plate  

barrier operator

V

T

120

150

Ø30

FB

base plate 

guide in bracket

Summary of Contents for Pass 838

Page 1: ...Installation and operating manual Barrier PASS 838...

Page 2: ...ontact opening gap of minimum 3 mm has to be foreseen When installing the safety device photocells safety edges emergency stops etc please comply with the valid direcitves standards the criteria of pr...

Page 3: ...boom can be opened and closed manually after loosening the emergency release hand wheel Due to its particularly massive execution and the very short opening and closing times the Tousek PASS 838 barr...

Page 4: ...ng lever 3 chain 4 gearing lever 5 balancing spring 6 euro standard lock cylinder 7 earthing bolt 8 activator bolt for door switch 9 door safety switch 10 drive shaft 11 Limit bolt boom OPEN 12 Limit...

Page 5: ...he barrier where you wish to mount the boom The following mounting steps differ in accordance of whether you wish to mount the round or the flat barrier boom Important grease the drive shaft put some...

Page 6: ...40 and disc with drive shaft A close the opening of boom with plastic plug Attach the plastic covers onto the boom and drive shaft end Fixing the flat boom example as left barrier M housing backside e...

Page 7: ...with the boom Then bolt 4 x with discs the boom carrier M with the slide in module inside boom E Now connect the boom B with cylinder head bolt M10 x 40 and disc with drive shaft A close the opening...

Page 8: ...An all pole disconnecting mains switch with a contact opening gap of min 3 mm has to be foreseen The gate facility has to be secured according to the valid safety regulations IMPORTANT The control li...

Page 9: ...or The switching time and also the boom limit positions can be defined by bolting in or out the limit stop bolts Note Please note that when the limit stop bolts are being adjusted AO or AG the limit p...

Page 10: ...may be moved manually slowly not faster than with the operator Torestoreoperationofthemotorpulltheemergencyrelease clockwise again firmly Move the boom a little so that the lever gear snaps into the...

Page 11: ...laws during installation or operation of the gate facility Note concerning cable laying The electric cables have to be laid in insulating sleeves whicharesuitableforundergroundusage Theinsulating slee...

Page 12: ...with the grease press Check and adjust the end positions opened and closed Check the proper function of the emergency release Check the proper function of the housing lid safety switch Check the gear...

Page 13: ...om the ground level to a minimum of 100mm Thefoundationdepthfromgroundleveltoshould have a minimum of 800mm frost resistant The foundation always has to be adjusted to the structure of the ground It s...

Page 14: ...ons subject to change 280 250 280 290 180 180 255 290 30 135 3 950 1100 116 100 100 base plate barrier width boom length NOTE 838V ST 838 L3 ST80 838 L4 ST80 838 L6 ST80 max barrier width 3m 4 5m 6m b...

Page 15: ...do a una razonada solicitud dentro de un plazo razonable en forma electr nica Para la preparaci n de la documentaci n t cnica est autorizada TOUSEK Ges m b H A1230 Viena Zetschegasse 1 Austria La m qu...

Page 16: ...ka 67 Tel 48 32 738 53 65 Fax 48 32 738 53 66 info tousek pl Tousek s r o Czech Republic CZ 130 00 Praha 3 Jagellonsk 9 Tel 420 2 2209 0980 Fax 420 2 2209 0989 info tousek cz We reserve the right to c...

Reviews: