background image

- 8 - 

tousek

  /  E_PASS-838_02  /  22. 10. 2018

SI

F

M

G

3e.  Force adjusment 

•  The force adjustment is made by the ST80 control board.
•  Due to the spring balance, the operator force is measured 

in a way, that the barrier boom may be stopped with little 

effort.

•  As an additional safety device we recommend the connection 

of a photocell.

3c.  Electrical connections 

Installation

•  Before carrying out the electrical connections, the power 

supply of the gate facility must be turned off !

•  Connect the operator to the control unit according corre-

sponding control manual  

 (mind the beside installation 

notes).

•  For the connection of  diverse safety devices, transmitters and 

other accessories please check the corresponding manuals  

(please note cable/wire plan).

 Warning

•  Before carrying out the electrical connections, the power supply of the gate facility must be turned off !  

•  The safety regulations for electric shock prevention have to be complied.

•  The device should only be connected by qualified personnel 
•  The device should not be used in an explosive environment !

•  An all-pole disconnecting mains switch with a contact opening gap of min. 3 mm has to be foreseen. 

The gate facility has to be secured according to the valid safety regulations!

• IMPORTANT: The control lines (buttons, radio, photocells, etc.) have to be laid separately 

from the 230V lines (supply line, motors, signal lamp). and may have a max. length of 50m.  

For length > 50m decoupling steps are necessary !

 

Important installation notes

•  Attention: The operator works with the condenser 

mounted on the motor. Therefore don´t connect an 

additional condenser to the control unit.

•  The operator housing is equipped with a safety switch 

(S) which stops the motor as soon as the housing 

lid is opened. This safety switch must be connected 

to the motor control unit (input for STOP switch).

3d.  Adjustment of spring tension 

Installation

•  The adjustment of spring tension is made by turning the 

screw nut 

(M)

 on the spring rod.

 Warning

•  The safety standards and regulations regarding the 

force adjustment have to be in compliance  with the 

effective rules !  

 Important 

•  The spring (F) has to be adjusted so that the boom 

can be moved easily by hand in emergency release 

state. (with pendulum arm and/or boom grid). 

The boom   should have a position of approx. 

20–40°.

Summary of Contents for Pass 838

Page 1: ...Installation and operating manual Barrier PASS 838...

Page 2: ...ontact opening gap of minimum 3 mm has to be foreseen When installing the safety device photocells safety edges emergency stops etc please comply with the valid direcitves standards the criteria of pr...

Page 3: ...boom can be opened and closed manually after loosening the emergency release hand wheel Due to its particularly massive execution and the very short opening and closing times the Tousek PASS 838 barr...

Page 4: ...ng lever 3 chain 4 gearing lever 5 balancing spring 6 euro standard lock cylinder 7 earthing bolt 8 activator bolt for door switch 9 door safety switch 10 drive shaft 11 Limit bolt boom OPEN 12 Limit...

Page 5: ...he barrier where you wish to mount the boom The following mounting steps differ in accordance of whether you wish to mount the round or the flat barrier boom Important grease the drive shaft put some...

Page 6: ...40 and disc with drive shaft A close the opening of boom with plastic plug Attach the plastic covers onto the boom and drive shaft end Fixing the flat boom example as left barrier M housing backside e...

Page 7: ...with the boom Then bolt 4 x with discs the boom carrier M with the slide in module inside boom E Now connect the boom B with cylinder head bolt M10 x 40 and disc with drive shaft A close the opening...

Page 8: ...An all pole disconnecting mains switch with a contact opening gap of min 3 mm has to be foreseen The gate facility has to be secured according to the valid safety regulations IMPORTANT The control li...

Page 9: ...or The switching time and also the boom limit positions can be defined by bolting in or out the limit stop bolts Note Please note that when the limit stop bolts are being adjusted AO or AG the limit p...

Page 10: ...may be moved manually slowly not faster than with the operator Torestoreoperationofthemotorpulltheemergencyrelease clockwise again firmly Move the boom a little so that the lever gear snaps into the...

Page 11: ...laws during installation or operation of the gate facility Note concerning cable laying The electric cables have to be laid in insulating sleeves whicharesuitableforundergroundusage Theinsulating slee...

Page 12: ...with the grease press Check and adjust the end positions opened and closed Check the proper function of the emergency release Check the proper function of the housing lid safety switch Check the gear...

Page 13: ...om the ground level to a minimum of 100mm Thefoundationdepthfromgroundleveltoshould have a minimum of 800mm frost resistant The foundation always has to be adjusted to the structure of the ground It s...

Page 14: ...ons subject to change 280 250 280 290 180 180 255 290 30 135 3 950 1100 116 100 100 base plate barrier width boom length NOTE 838V ST 838 L3 ST80 838 L4 ST80 838 L6 ST80 max barrier width 3m 4 5m 6m b...

Page 15: ...do a una razonada solicitud dentro de un plazo razonable en forma electr nica Para la preparaci n de la documentaci n t cnica est autorizada TOUSEK Ges m b H A1230 Viena Zetschegasse 1 Austria La m qu...

Page 16: ...ka 67 Tel 48 32 738 53 65 Fax 48 32 738 53 66 info tousek pl Tousek s r o Czech Republic CZ 130 00 Praha 3 Jagellonsk 9 Tel 420 2 2209 0980 Fax 420 2 2209 0989 info tousek cz We reserve the right to c...

Reviews: