4
ENGLISH
BEFORE INSTALLATION
Read these instructions thoroughly before beginning work.
Please leave these instructions for customers. These instructions contain mainte-
nance and warranty information.
If necessary, remove the existing toilet.
INSTALLATION PROCEDURE
called the Rough-In.
Supply
Valve
Finished Wall
"RI"
C/L
Closet
Flange
1.
then install new mounting bolts (not supplied)
head of the bolt should be inserted into the slot
with its threads facing upward.
2. Carefully turn the toilet upside down onto some
padding. Firmly press a new bowl wax ring
(not supplied) onto the circular recess around
the toilet bowl’s horn (see Ill. 2). Turn the toilet
upright and gently lower into position over the
wax ring.
C AUTION: Do not move the bowl after the bowl
wax ring is set. Thread nuts and tighten evenly until
C AUTION: Do not over-tighten the nuts as damage to
the china bowl may result.
Ill. 1
IMPORTANT!
Due to the powerful performance of our Cyclone, G-Max, E-Max and Power Gravity
means of installing these toilets in a back-to-back situation is when the toilet drain
to this installation.
Double Combination WYE / 1/8 Bend
YES
Double Sanitary Tee / Sanitary Cross
NO
Wax Ring
Horn
Ill. 2
DISCONTINUED
Summary of Contents for CST405F
Page 2: ...CST406MF D I S C O N T I N U E D...
Page 12: ...D I S C O N T I N U E D...
Page 22: ...D I S C O N T I N U E D...