6
SET UP
5A
. Next remove plastic packing ties from the top and bottom of
the vertical column. Pull out the Spring Loaded Pin located at the
left rail (
NOTE:
pin shown in picture is on left side of unit standing
behind it and looking at the back of the vertical column) to release
Spring Loaded Pin. Continue to hold pin out while performing the
next step.
5B
. Take hold of the vertical column and pull it up until it is upright.
Release the Spring Loaded Pin. You should hear it lock back into
place. (
NOTE:
pin shown in picture is on left side of unit standing
behind it and looking at the back of the vertical column).
IMPORTANT:
Be sure the Spring Loaded Pin is locked into place
before using your unit. You will know the pin is locked into place
when you can see the end protrude through the inside of the
rail bracket.
6.
Position one foot on back crossbar to keep the product from
lifting off the fl oor. With one hand on either the right or left rail and
the other hand pulling the Height Adjustment Quick Release Pin
out, slide the rails along the vertical column to desired position and
release pin. Pin will lock into place—you will hear a loud click once
locked. Last, insert Safety Hitch Pin (attached with a lanyard to the
height adjustment assembly) into the hole of the height adjustment
assembly and vertical column (directly into the opposite side of the
Height Adjustment Quick Release Pin).
NOTE:
Insert Safety Hitch C Pin into side hole located directly below
height adjustment assembly on vertical column.
7. SQUAT STAND ASSEMBLY.
Assemble the Squat Stand at the
opposite end of the unit by inserting the attachment into the front
crossbar receptacles as pictured here. Make sure the accessory
is fully inserted.
NOTE:
Remove Squat Stand from frame when not
required for the specifi c exercise.
8. TRAINING DECK ASSEMBLY
. To add the Training Deck, insert
the Training Deck base into the vertical column. Then secure the
Training Deck holder onto the Training Deck base.