ZK1800
SWING GATE OPERATOR USER’S MANUAL
23
Open priority
The gate will return t
o open if you press the ‘OPEN’ button on the three-button mode external button
switch during closing, the beeper will ring.
Operation
Unlock the gate operator with the key. Push the gates to the opened position manually. Lock
the gate operator with the key.
Turn the power on.
Close the gates by using remote control or external button switch. The secondary gate closes
first, after 3 seconds, the primary gate-leaf closes, the secondary gate-leaf will stop earlier
than the primary gate-leaf with lock, so that both sections can be locked properly, or you can
stop the gate at its closed position by remote control or external button switch.
If gates do not stop or bind before stopping, verify that the stop is firmly in place, and the
sensitivity adjustment knob for that gate on the control board is adjusted correctly. Adjust
counter-clockwise to reduce binding.
Open the gates by remote control or external button switch. Firstly, the electrical lock will be
opened, the primary gate-leaf with lock opens, after 3 seconds, the secondary gate-leaf
opens, the primary gate-leaf will stop earlier than the secondary gate-leaf.
If gates do not stop or bind before stopping, verify that the stop is firmly in place, and the
force adjustment knob for that gate on the control board is adjusted correctly. Adjust
counter-clockwise to reduce binding.
Total working time: 30 seconds.
12. Maintenance
Add 1# lithium base grease to lead screw regularly.
Regularly verify that the gate swings freely and add grease regularly.
Make sure the hinges function perfectly.
Verify correct operation of the safety devices.
Keep operator clean at all times.