Central Remote Controller
Installation Manual
6
-EN
3
Installation
3-1. Power, Signal, and Earth Line Connections
Connect the power, signal and earth lines to the specified terminal blocks.
REQUIREMENT
Attach round crimp terminals to all TU2C-LINK / TCC-LINK wiring and tighten the screws securely.
After tightening, check that the wiring cannot come out.
(1) Remove 3 cover fixing screws pointed to by arrows and open the cover
(2) Insert cross notches in the rubber bushing in order to pass the power supply cable
(3) Pass the power supply cable through the rubber bushing and the clamp, and connect the power supply wire and
the ground wire to the specified terminal block
(4) Close the cover and secure with 3 cover fixing screws
Connect the TU2C-LINK / TCC-LINK signal wire (Uh / U3U4) to the terminal block
Connect the power supply wire and the ground wire
Connect the signal wires
Cover fixing screw
Screws indicated by arrows
Cover fixing screw
Power supply cover
Rear side
terminal block
Power terminal
Power supply wire
Clamp
Ground wire
Ground terminal
Rubber bushing
(Remove the transparent
cover at installation and return
it to its original position after
connecting)
5 mm
18 mm
Termination resistance (SW1)
−
L N
COM
DI3
DI2
DI1
COM
DO2
DO1
U3
U4
TU2C-LINK / TCC-LINK does not
have polarity.
Connect the shield of the central
control wiring to the earth on the air
conditioner side.
Leave the shield open (and insulate
it). Do not connect it to the terminal
block.
Uh line
Central control wiring
Outdoor unit
Indoor unit
Remote controller
Power 220-240 V AC
Securely fix the cable with
a clamp.