OPERATION
The powering-on operation must follow a certain sequence. Failing to observe the powering-on
sequence described here may cause unnecessary stress on the equipment.
Be sure to observe the
powering-on sequence
.
While the equipment is in operation and the motor is running, do
not turn off the main circuit power supply or control power supply
under any circumstances. Do not open the cubicle doors or remove any
covers.
When the operation of the equipment is completely stopped, use the following basic procedure to
turn on/off the power.
NOTE: On some drives, the control power supply is internally derived from the main circuit power
supply. In this case, disregard the steps below involving the 480 VAC control power supply.
General power-on and power-off sequence.
Powering-on sequence
Turn on control power supply.
480 VAC-50/60 Hz
Turn on main circuit power supply.
Powering-off sequence
Check that operation is stopped.
Turn off control power supply.
480VAC-50/60 Hz
Turn off main circuit power supply.
WARNING
Summary of Contents for T300MTX
Page 19: ...IF08CZ10 April 2019 xix This page intentionally left blank ...
Page 62: ...IF08CZ10 April 2019 40 CIRCUIT OPERATION cont d 6600V configuration ...
Page 78: ...IF08CZ10 April 2019 56 DRIVE INSTALLATION DRAWINGS Frame 0 drive lifting and assembly ...
Page 106: ...IF08CZ10 April 2019 84 DRIVE INSTALLATION DRAWINGS cont d Frame A2 drive lifting and assembly ...
Page 109: ...IF08CZ10 April 2019 87 DRIVE INSTALLATION DRAWINGS cont d Frame B2 drive lifting and assembly ...
Page 111: ...IF08CZ10 April 2019 89 DRIVE INSTALLATION DRAWINGS cont d Frame D2 drive lifting and assembly ...
Page 116: ...IF08CZ10 April 2019 94 DRIVE INSTALLATION DRAWINGS cont d Frame A4 drive lifting and assembly ...