![Toshiba RAV-GM 1101UT-E Service Manual Download Page 54](http://html.mh-extra.com/html/toshiba/rav-gm-1101ut-e/rav-gm-1101ut-e_service-manual_1135185054.webp)
– 54 –
5. Short interrupted operation preventive control
1) Even when a thermostat OFF signal is received from the indoor unit, the compressor may not stop during
3 to 10 minute period after startup in order to protect the compressor.
This operation is not a trouble condition. ( The continuous operation time for compressor differs
depending on the operational status.)
2) When operation is terminated by using a remote controller, operation will not continue.
6. Electrical current release control
An AC current detection value from T10 on the control board is used to suppress the revolution number of
the compressor so that the input current of the inverter does not exceed a specified value.
4. Defrost control
1) During heating operations, defrost operations are performed when the temperature from the TE sensor
satisfies any of the conditions in the A to D zones.
2) During defrosting operations, defrost will be terminated if the temperature from the TE sensor continues
at 12°C or higher for 3 seconds or if the temperature is 7°C
≤
TE < 12°C for 1 minute.
Furthermore the defrost operation will be terminated if defrosting operations have continued for 10
minutes even if TE sensor temperature is less than 7°C.
3) After defrost operations have been reset, the compressor restarts heating operations without stopping.
TE [˚C]
–5˚C
–2˚C
–10˚C
–2
3
˚C
0
10
3
9
[min.]
15
45
55
150
A zone
∗
D zone
B zone
C zone
∗
The minimum TE value during 10 and 15 minutes after starting heating operation is stored as TEO.
A Zone
B Zone
C Zone
D Zone
When To is normal
When To is abnormal
Stat
us
[(TEO-TE) – (ToO-To)
≥
3
˚C] contin
u
e
s
for 20
s
econd
s
Stat
us
[TEO- TE
≥
3
˚C] contin
u
e
s
for 20
s
econd
s
Stat
us
[(TEO-TE) – (ToO-To)
≥
2˚C] contin
u
e
s
for 20
s
econd
s
Stat
us
[TEO-TE
≥
2˚C] contin
u
e
s
for 20
s
econd
s
Stat
us
[TE
≥
2
3
˚C] contin
u
e
s
for 20
s
econd
s
When compre
ss
or operation
s
tat
us
TE < 2˚C i
s
calc
u
lated for 150 min
u
te
s
A Zone
D Zone
B Zone
C Zone
Normal operation.
Maintain freq
u
ency of c
u
rrent operation.
Red
u
ce operating freq
u
ency.
Cea
s
e red
u
ction of operating freq
u
ency
and maintain freq
u
ency of c
u
rrent operation.
GP110, 140
GP80
l1 value (A)
C
u
rrent (A)
l
1–1.0
l
1
D zone
C zone
B zone
A zone
20.0
17.0
Cooling
20.0
20.0
Heating
Summary of Contents for RAV-GM 1101UT-E
Page 30: ... 30 2 CONSTRUCTION VIEWS EXTERNAL VIEWS 2 1 RAV GP801AT ...
Page 31: ... 31 2 2 RAV GP1101AT GP1401AT ...
Page 36: ... 36 4 WIRING DIAGRAM 4 1 RAV GP801AT 220 240V 50Hz P 3 3 Fuse 25A 250V Fuse 10A 250V ...
Page 37: ... 37 4 2 RAV GP1101AT GP1401AT 220 240V 50Hz P 3 3 3 Fuse 25A 250V Fuse 10A 250V ...