
Safety
iii
2. Safety Precautions for Inspection and Maintenance
WARNING
Turn off power:
Turn off power before attaching or detaching modules or before connecting devices. Failure to do so
may result in electric shock or equipment fault.
Make sure that power is off:
Always check and make sure that the external power is turned off before installing or removing
modules. Bare metals appear on the back of external terminal block of the module. To avoid electric
shock, take precautions against touching them.
CAUTION
Clean filters:
If the equipment has filters, clean them periodically. If it has fans, clean grilles and screens also.
Clogged filter may cause the equipment to overheat, resulting in malfunction, failure or fire.
Avoid shock:
Do not drop, bump or give strong shocks to the equipment or modules to avoid fault. Shocks may
cause malfunction.
Discharge static electricity:
Before handling equipment or modules, discharge static electricity from your body by touching a
metal that is grounded. Static electricity may cause equipment to malfunction or fail.
Use a conductive sheet or bag to avoid static:
When cards and modules are taken out of base-unit, they should be placed on an electrically
conductive sheet (the bag that comes with spare module in it is made of conductive sheet), which is
put on a grounded work bench. Static electricity may damage electrical parts.
Wipe off dirt:
Wipe off dirt and dust from equipment or modules, using a soft cloth. In case the dirt is persistant,
wet a cloth and wring it dry, then use it on the dirt. Dirt on the parts may result in faulty actions and
operations.
Do not use paint thinner for cleaning:
Do not use benzene, paint thinner for cleaning equipment or modules. These chemicals will distort
or discolor panels and modules.
Summary of Contents for OIS-DS/Smart
Page 1: ...OIS DS SMART System Function Manual 6F8C1001 Toshiba Integrated Control System ...
Page 10: ...Safety viii ...
Page 18: ...1 Outline 4 ...
Page 24: ...2 Function Outline 10 Figure 2 4 Tag Group Display Figure 2 5 Point Display Screen ...
Page 25: ...2 Function Outline 11 Figure 2 6 Tag Search Screen Figure 2 7 Graphic Screen ...
Page 52: ...4 Software Package Configuration 38 ...
Page 54: ...5 Operating Conditions 40 ...
Page 58: ...Appendix 1 Alarm Confirmation Method 44 ...
Page 59: ......
Page 60: ...Industrial Systems Division 72 34 Horikawa Cho Saiwai Ku Kawasaki 212 8585 Japan ...